Name of Work:- CONSTRUCTION OF PROTECTION WALL.Location : Start from Main Road to Colony More in ward no. 12
Sl. No.
Item Description
1
Earth work in excavation of foundation trenches or drains ,in all sorts of soil ( including mixed soil but excluding lateric or sand stone)including removing spreading or stacking the soils within a lead of 75m as directed . The item includes necessary training the sides of trenches, leveling ,dressing and ramming the bottom, bailing out water etc.as required complete.(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiringP-1,It-2/a
2
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 150mincluding watering and ramming etc. with earth obtained from excavation of foundation. i) From ExcavationP-1,It-3/a
3
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)P-2It-4A
4
Single brick flat solling of picked jhama bricks including ramming and dressing bed to proper level, and or local sand.P-14, Sl.-1
5
Cement concrete with Graded Stone balast (40 mm size) excluding shuttering. In Ground floor and foundation. (a) 6:3:1 proportionP-9,It-26
6
Brick work with 1st class bricks in cement mortar (6:1) (a) In foundation and plinthP-1,It-4/a
7
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding i) 15 mm thick (6:1)P-189,It-1/ii/b
8
Neat cement punning about 1.5 mm thick in wall dado, window, sills, floor, drain etc.P-192,It-15
9
Earth work in filling in foundation trenches orplinth with good earth, in layers not exceeding150 mm. including watering and ramming etc.layer by layer complete. (Payment to be made onthe basis of measurement of finished quantity ofwork)(i) With carried earth arranged by thecontractor within a radius of 1 km. including costof carried earth.P-1, Sl.-3/c
10
Add 18 % GST
11
Add 1% Welfare Cess Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.