|
| 1 | Item Description/ Heading |
| 2 | Boring/drilling bore well of 300 mm dia for casing/strainer pipe by suitable method prescribed in IS: 2800 (part-I), including collecting samples from different strate, preparing and submitting strata chart/bore log, inclduing hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.150mm dia. |
| 3 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplsticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete for all depths, as per direction of Engineer-in-charge. 100 mm nominal size dia. |
| 4 | Supplying, fitting and fixing special hand pump no.06 of approved make (for 40 mm or 40 mm dia. Tube well) |
| 5 | Supplying of G.I pipes 32mm dia nominal dia including fittings. |
| 6 | Supplying of cylinde 75mm dia, 400mm length. |
| 7 | Supplying of 1.0 HP submersible pump motor, cable and starter. |
| 8 | Providing and fixing service line cable 2.5mm |
| 9 | Supplying of Nylon rope 20 mm dia. |
| 10 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement ,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge.External work:32 mm nominal outer dia Pipes |
| 11 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 12 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. |
| 13 | BFS with K/B bricks joints filled with sand. |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 15 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) |
| 16 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) |
| 17 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 18 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |