Tender For Tangedco - Nctps-I-(3X210mw) - Installation Of Semi Dry Flue Gas Desulphurization System Complete Design, Engineering, Manufacture / Supply, Inspection And Testing At Suppliers Works, Packing, Forwarding To Site, Transportation, Unloading,
Tender Overview
Project Description
Tender for Tangedco - Nctps-I-(3X210mw) - Installation Of Semi Dry Flue Gas Desulphurization System Complete Design, Engineering, Manufacture / Supply, Inspection And Testing At Suppliers Works, Packing, Forwarding To Site, Transportation, Unloading, Storage, Preservation, Insurance, Handling At Site, Pre-Assembly, Assembly, Erection / Supervision Of Erection, Final Painting, Start-Up, Pre-Commissioning, Testing & Trial Run, Commissioning, Performance Guarantee Testing And Warranty Of Fgd System Up To Completion Of Warranty Period, Training Of Purchasers Personnel For Complete Fgd Equipment / System Covering All Mechanical, Electrical, C&I, Associated Steel Structure, Civil & Architectural Works For Semi Dry Flue Gas Desulphurization System In All Units Of3 X 210 Mw Steam Generators With Complete Associated Auxiliaries, Accessories And Other Related Items Of Respective Work For The Complete Fgd Plant And Equipment On Turnkey Engineering, Procurement And Construction Basis, Necessary For Putting Into Operation, A Highly Reliable, Safe, Efficient And Environmentally Compliant Fgd Plant In Order To Reduce The Sox Emission To Comply The New Environmental Norms In 3X210mw Units Of Nctps I, Athipattu, Tiruvallur Dist., Tamil Naduunder Single Epc Basis.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 06-Apr-2026 |
| 2 | 29-May-2026 | Due date extension 4 | Date | 17-Jun-2026 |
| 3 | 07-May-2026 | DUE DATE EXTENSION 3 | Date | 09-Jun-2026 |
| 4 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 17-Jun-2026 |
| 5 | 17-Apr-2026 | DUE DATE EXTENSION 2 | Date | 19-May-2026 |
| 6 | 24-Mar-2026 | DUE DATE EXTENSION | Date | 28-Apr-2026 |
| 7 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 17-Jun-2026 |
| 8 | 07-May-2026 | DUE DATE EXTENSION 3 | Date | 09-Jun-2026 |
| 9 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 09-Jun-2026 |
| 10 | 17-Apr-2026 | DUE DATE EXTENSION 2 | Date | 19-May-2026 |
| 11 | 24-Mar-2026 | DUE DATE EXTENSION | Date | 28-Apr-2026 |
| 12 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 09-Jun-2026 |
| 13 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 14-Jul-2026 |
| 14 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 14-Jul-2026 |
| 15 | 15-Jun-2026 | Due Date Extension 5 | Date | 02-Jul-2026 |
| 16 | 04-Jun-2026 | PRE BID MEEETING POSTPONED | Other | 14-Jul-2026 |
| 17 | 30-Jun-2026 | DUE DATE EXTENSION 6 | Date | 14-Jul-2026 |
| 18 | 07-May-2026 | DUE DATE EXTENSION 3 | Date | 09-Jun-2026 |
| 19 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 02-Jul-2026 |
| 20 | 17-Apr-2026 | DUE DATE EXTENSION 2 | Date | 19-May-2026 |
| 21 | 04-Jun-2026 | PRE BID MEEETING POSTPONED | Other | 02-Jul-2026 |
| 22 | 29-May-2026 | Due date extension 4 | Date | 17-Jun-2026 |
| 23 | 24-Mar-2026 | DUE DATE EXTENSION | Date | 28-Apr-2026 |
| 24 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 02-Jul-2026 |
| 25 | 15-Jun-2026 | Due Date Extension 5 | Date | 02-Jul-2026 |
| 26 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 28-Apr-2026 |
| 27 | 24-Mar-2026 | DUE DATE EXTENSION | Date | 28-Apr-2026 |
| 28 | 17-Apr-2026 | DUE DATE EXTENSION 2 | Date | 19-May-2026 |
| 29 | 24-Mar-2026 | DUE DATE EXTENSION | Date | 28-Apr-2026 |
| 30 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 19-May-2026 |
| 31 | 04-Jun-2026 | PRE BID MEEETING POSTPONED | Other | 05-Aug-2026 |
| 32 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 05-Aug-2026 |
| 33 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 05-Aug-2026 |
| 34 | 13-Jul-2026 | Due date extension 7 | Date | 05-Aug-2026 |
| 35 | 09-Jul-2026 | Prebid meeting postponed from 03.07.26 to 05.08.26 | Other | 05-Aug-2026 |
| 36 | 03-Aug-2026 | DUE DATE EXTENSION 8 | Date | 27-Aug-2026 |
| 37 | 04-Jun-2026 | PRE BID MEEETING POSTPONED | Other | 27-Aug-2026 |
| 38 | 05-May-2026 | Postponed the Pre Bid meeting once again from 07 05 2026 to 05 06 2026 for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 27-Aug-2026 |
| 39 | 09-Jul-2026 | Prebid meeting postponed from 03.07.26 to 05.08.26 | Other | 27-Aug-2026 |
| 40 | 13-Jul-2026 | Due date extension 7 | Date | 05-Aug-2026 |
| 41 | 20-Mar-2026 | Postponed the Pre Bid meeting for the work of Installation of Semi Dry Flue Gas desulphurization system | Other | 27-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR3x210 MW CHENNAI - 600120 THERMAL POWER STATION BOOSTER FAN AND DUCTING SYSTEMINDIAN COMPONENTS |
| 2 | SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR3x210 MW CHENNAI - 600120 THERMAL POWER STATION BOOSTER FAN AND DUCTING SYSTEMFOREIGN COMPONENTS |
| 3 | ABSORBER / REACTOR SYSTEM INDIAN COMPONENTS |
| 4 | ABSORBER / REACTOR SYSTEM FOREIGN COMPONENTS |
| 5 | FABRIC/BAG FILTER SYSTEMINDIAN COMPONENTS |
| 6 | IFABRIC/BAG FILTER SYSTEMFOREIGN COMPONENTS |
| 7 | LIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEMINDIAN COMPONENTS |
| 8 | LIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEMFOREIGN COMPONENTS |
| 9 | BY-PRODUCT COLLECTION AND CONVEYING SYSTEMINDIAN COMPONENTS |
| 10 | BY-PRODUCT COLLECTION AND CONVEYING SYSTEMFOREIGN COMPONENTS |
| 11 | COMPRESSED AIR & PLANT WATER SYSTEMINDIAN COMPONENTS |
| 12 | COMPRESSED AIR & PLANT WATER SYSTEMFOREIGN COMPONENTS |
| 13 | HVAC & FIRE FIGHTING SYSTEMINDIAN COMPONENTS |
| 14 | HVAC & FIRE FIGHTING SYSTEMFOREIGN COMPONENTS |
| 15 | ELECTRICAL, CONTROL & INSTRUMENTATIONINDIAN COMPONENTS |
| 16 | ELECTRICAL, CONTROL & INSTRUMENTATIONFOREIGN COMPONENTS |
| 17 | SUPPLY OF MANDATORY SPARESSupply of Mandatory spares ( as specified in Volume VI)INDIAN COMPONENTS |
| 18 | SUPPLY OF MANDATORY SPARESSupply of Mandatory spares ( as specified in Volume VI)FOREIGN COMPONENTS |
| 19 | SUPPLY OF MISCELLANEOUS ITEMSSupply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the SpecificationINDIAN COMPONENTS |
| 20 | SUPPLY OF MISCELLANEOUS ITEMSSupply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the SpecificationFOREIGN COMPONENTS |
| 21 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksBOOSTER FAN AND DUCTING SYSTEM |
| 22 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksABSORBER / REACTOR SYSTEM |
| 23 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksFABRIC/BAG FILTER SYSTEM |
| 24 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksLIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEM |
| 25 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksBY-PRODUCT COLLECTION AND CONVEYING SYSTEM |
| 26 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksCOMPRESSED AIR & PLANT WATER SYSTEM |
| 27 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksHVAC & FIRE FIGHTING SYSTEM |
| 28 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksELECTRICAL, CONTROL & INSTRUMENTATION |
| 29 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksANY OTHER ITEMS |
| 30 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksSUPPLY OF MANDATORY SPARES |
| 31 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEMAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES |
| 32 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCECIVIL & ARCHITECTURAL WORKS |
| 33 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEINFRASTRUCTURE WORKS |
| 34 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEIFGD FACILITIES |
| 35 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEOTHER WORKS (Not covered in the above items but required to cover complete scope of works) |
| 36 | TYPE TEST CHARGESType Test charges for all Electro-Mechanical equipments |
| 37 | IMPARTING TRAININGImparting Training to Owner's personnal at project site |
| 38 | ANY OTHER ACTIVITY NOT LISTED ABOVEAny other activity not listed above but required for the safe and successful operation of the plant as per the scope of supply Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-15 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-16 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-17 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-18 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-19 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-20 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-21 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-22 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-23 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-24 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-25 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-26 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-27 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-28 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-29 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-30 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-31 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-32 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-33 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-34 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-35 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-36 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-37 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-38 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-39 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-40 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-41 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender