|
| 1 | 11KV PERIYANATHAM FEEDER |
| 2 | Supply of 9 mtr PSC Poles 300 Kg WL |
| 3 | Supply of Concrete baseplate for PSC Pole [450x450x75mm] |
| 4 | Supply of Backclamp for 9 mtr PSC Pole 300 Kg WL [Hot DIP GI] [1.584 Kg] |
| 5 | Supply of 1068mm [3\\"-6\\"] \\"V\\" cross arm [Hot DIP GI] [11 KG] |
| 6 | Supply of 11KV HT TI Fittings [Hot DIP GI] [3 KG] |
| 7 | Supply of 11KV Polymer Composite pin Insulators [Including pin] |
| 8 | Supply of 11KV Tapping Channel Arm [[Hot DIP GI] [15.774 KG] |
| 9 | Supply of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor]. |
| 10 | Supply of Stayset complete including GI wire [5kg], Eye, bow, 16mm rod, thimble, Stayplate & Stay clamp [pair] for 9.0 mtr PSC Pole 300KG GI |
| 11 | Supply of 11KV HT Guy Insulator |
| 12 | Supply of AAAC Racoon Conductor 7/4.09mm |
| 13 | Supply of Wedge Connector |
| 14 | Supply of GI Bolt, Nuts, Washer etc. |
| 15 | Labour Charges for Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 16 | Labour Charges for Loading of PSC poles |
| 17 | Labour Charges for Unloading of PSC Poles |
| 18 | Labour Charges for Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole 9 mtr by using JCB or Manual |
| 19 | Labour Charges for Erection of 9 mtr PSC poles by using JCB or manual with Baseplate |
| 20 | Labour Charges for Pole concreting with size (2'x2'x3') including cost of excavation Cement ,40 mm jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials |
| 21 | Labour Charges for Fixing of Backclamp for 9 mtr PSC Pole 400 Kg WL [Hot DIP GI] [1.584 Kg] |
| 22 | Labour Charges for Excavation of Stay pit 2'x2'x5' depth by using JCB or manual |
| 23 | Labour Charges for Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting |
| 24 | Labour Charges for Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2. |
| 25 | Labour Charges for Earthing [Coil] including GI wire 8 SWG earthing wire [10kg] & Bolt & nuts [M16] - 5 Kg for HT/LT Line works |
| 26 | Labour Charges for Fixing of 11KV 3 1/2 HT \\"V\\" cross arms |
| 27 | Labour Charges for Fixing of 11KV HT TI Fittings |
| 28 | Labour Charges for Fixing of 11KV Polymer Composite pin Insulators [Including pin] |
| 29 | Labour Charges for Fixing of 11KV Tapping Channel Cross Arm |
| 30 | Labour Charges for Fixing of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor] |
| 31 | Labour Charges for Fixing of HT Guy Insulator |
| 32 | Labour Charges for Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor |
| 33 | Labour Charges for Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 34 | Labour Charges for Fixing of Wedge Connector |
| 35 | 11KV MELPERAMANALUR FEEDER |
| 36 | Supply of 9 mtr PSC Poles 300 Kg WL |
| 37 | Supply of Concrete baseplate for PSC Pole [450x450x75mm] |
| 38 | Supply of Backclamp for 9 mtr PSC Pole 300 Kg WL [Hot DIP GI] [1.584 Kg] |
| 39 | Supply of 1068mm [3\\"-6\\"] \\"V\\" cross arm [Hot DIP GI] [11 KG] |
| 40 | Supply of 11KV HT TI Fittings [Hot DIP GI] [3 KG] |
| 41 | Supply of 11KV Polymer Composite pin Insulators [Including pin] |
| 42 | Supply of 11KV Tapping Channel Arm [[Hot DIP GI] [15.774 KG] |
| 43 | Supply of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor]. |
| 44 | Supply of Stayset complete including GI wire [5kg], Eye, bow, 16mm rod, thimble, Stayplate & Stay clamp [pair] for 9.0 mtr PSC Pole 300KG GI |
| 45 | Supply of 11KV HT Guy Insulator |
| 46 | Supply of AAAC Racoon Conductor 7/4.09mm |
| 47 | Supply of Wedge Connector |
| 48 | Supply of GI Bolt, Nuts, Washer etc. |
| 49 | Labour Charges for Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 50 | Labour Charges for Loading of PSC poles |
| 51 | Labour Charges for Unloading of PSC Poles |
| 52 | Labour Charges for Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole 9 mtr by using JCB or Manual |
| 53 | Labour Charges for Erection of 9 mtr PSC poles by using JCB or manual with Baseplate |
| 54 | Labour Charges for Pole concreting with size (2'x2'x3') including cost of excavation Cement ,40 mm jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials |
| 55 | Labour Charges for Fixing of Backclamp for 9 mtr PSC Pole 400 Kg WL [Hot DIP GI] [1.584 Kg] |
| 56 | Labour Charges for Excavation of Stay pit 2'x2'x5' depth by using JCB or manual |
| 57 | Labour Charges for Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting |
| 58 | Labour Charges for Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2. |
| 59 | Labour Charges for Earthing [Coil] including GI wire 8 SWG earthing wire [10kg] & Bolt & nuts [M16] - 5 Kg for HT/LT Line works |
| 60 | Labour Charges for Fixing of 11KV 3 1/2 HT \\"V\\" cross arms |
| 61 | Labour Charges for Fixing of 11KV HT TI Fittings |
| 62 | Labour Charges for Fixing of 11KV Polymer Composite pin Insulators [Including pin] |
| 63 | Labour Charges for Fixing of 11KV Tapping Channel Cross Arm |
| 64 | Labour Charges for Fixing of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor] |
| 65 | Labour Charges for Fixing of HT Guy Insulator |
| 66 | Labour Charges for Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor |
| 67 | Labour Charges for Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 68 | Labour Charges for Fixing of Wedge Connector |
| 69 | 11KV VALATHOTTAM FEEDER |
| 70 | Supply of 9 mtr PSC Poles 300 Kg WL |
| 71 | Supply of Concrete baseplate for PSC Pole [450x450x75mm] |
| 72 | Supply of Backclamp for 9 mtr PSC Pole 300 Kg WL [Hot DIP GI] [1.584 Kg] |
| 73 | Supply of 1068mm [3\\"-6\\"] \\"V\\" cross arm [Hot DIP GI] [11 KG] |
| 74 | Supply of 11KV HT TI Fittings [Hot DIP GI] [3 KG] |
| 75 | Supply of 11KV Polymer Composite pin Insulators [Including pin] |
| 76 | Supply of 11KV Tapping Channel Arm [[Hot DIP GI] [15.774 KG] |
| 77 | Supply of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor]. |
| 78 | Supply of Stayset complete including GI wire [5kg], Eye, bow, 16mm rod, thimble, Stayplate & Stay clamp [pair] for 9.0 mtr PSC Pole 300KG GI |
| 79 | Supply of 11KV HT Guy Insulator |
| 80 | Supply of AAAC Racoon Conductor 7/3.81mm |
| 81 | Supply of Wedge Connector |
| 82 | Supply of GI Bolt, Nuts, Washer etc. |
| 83 | Labour Charges for Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 84 | Labour Charges for Loading of PSC poles |
| 85 | Labour Charges for Unloading of PSC Poles |
| 86 | Labour Charges for Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole 9 mtr by using JCB or Manual |
| 87 | Labour Charges for Erection of 9 mtr PSC poles by using JCB or manual with Baseplate |
| 88 | Labour Charges for Pole concreting with size (2'x2'x3') including cost of excavation Cement ,40 mm jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials |
| 89 | Labour Charges for Fixing of Backclamp for 9 mtr PSC Pole 400 Kg WL [Hot DIP GI] [1.584 Kg] |
| 90 | Labour Charges for Excavation of Stay pit 2'x2'x5' depth by using JCB or manual |
| 91 | Labour Charges for Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting |
| 92 | Labour Charges for Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2. |
| 93 | Labour Charges for Earthing [Coil] including GI wire 8 SWG earthing wire [10kg] & Bolt & nuts [M16] - 5 Kg for HT/LT Line works |
| 94 | Labour Charges for Fixing of 11KV 3 1/2 HT \\"V\\" cross arms |
| 95 | Labour Charges for Fixing of 11KV HT TI Fittings |
| 96 | Labour Charges for Fixing of 11KV Polymer Composite pin Insulators [Including pin] |
| 97 | Labour Charges for Fixing of 11KV Tapping Channel Cross Arm |
| 98 | Labour Charges for Fixing of 11KV HT strain sets [Polymer Composite disc with metal parts for Racoon Conductor] |
| 99 | Labour Charges for Fixing of HT Guy Insulator |
| 100 | Labour Charges for Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor |
| 101 | Labour Charges for Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 102 | Labour Charges for Fixing of Wedge Connector |
| 103 | 11KV SINGLE POLE STRUCTURE FOR ERECTION OF AB SWITCHES |
| 104 | Supply of 9 mtr RCC Poles [Square Section] |
| 105 | Supply of Concrete baseplate for RCC Pole [450x450x75mm] |
| 106 | Supply of 11KV Vertical Gang Operated Air Break Switch with Composite polymer Insulators, Single Square Pole Transformer Structure material with Clamp & 11KV Solid core Type HG Fuse Sets [GI} |
| 107 | Supply of 11KV Polymer Composite pin Insulators [Including pin] |
| 108 | Supply of 11KV Polymer Composite Disc Insulator [Including metal parts] |
| 109 | Supply of 11KV HT TI Fittings [Hot DIP GI] [3 KG] |
| 110 | Supply of 11KV Tapping Channel Arm [[Hot DIP GI] [15.774 KG] |
| 111 | Supply of Back Clamps for 9 Mtr RCC Square Pole [Hot DIP GI] [1.584 Kgs] |
| 112 | Supply of Stayset complete including GI wire [5kg], Eye, bow, 20mm rod, thimble, Stayplate & Stay clamp [pair] for 9.0 mtr RCC Square Pole GI |
| 113 | Supply of HT Guy Insulator |
| 114 | Supply of 11KV LAS Distribution Type |
| 115 | Supply of Name Board Caution / Danger Board - 250 x 200 x 1.6mm |
| 116 | Supply of GI Bolts, Nuts, Washers etc |
| 117 | Labour Charges for Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 118 | Labour Charges for Loading of PSC poles |
| 119 | Labour Charges for Unloading of PSC Poles |
| 120 | Labour Charges for Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole 9 mtr by using JCB or Manual |
| 121 | Labour Charges for Erection of 9 mtr PSC poles by using JCB or manual with Baseplate |
| 122 | Labour Charges for Concreting and Coping with sand, blue metal and cement for SP |
| 123 | Labour Charges for Fixing of Backclamp for 9 mtr PSC Pole 400 Kg WL [Hot DIP GI] [1.584 Kg] |
| 124 | Labour Charges for Excavation of Stay pit 2'x2'x5' depth by using JCB or manual |
| 125 | Labour Charges for Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting |
| 126 | Labour Charges for Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2. |
| 127 | Labour Charges for Structure Earthing Arrangement for Railway Crossing, Tapping, Single & Double Pole Structures [GI Earth Pipe 40mm dia 3 mtr long including GI wire & 8 SWG Earthing Wire] |
| 128 | Labour Charges for 11KV Vertical Gang Operated Air Break Switch with Composite polymer Insulators, Single Square Pole Transformer Structure material with Clamp & 11KV Solid core Type HG Fuse Sets [GI} |
| 129 | Labour Charges for Fixing of 11KV Polymer Composite pin Insulators [Including pin] |
| 130 | Labour Charges for Fixing of11KV Polymer Composite Disc Insulator [Including metal parts] |
| 131 | Labour Charges for Fixing of 11KV HT TI Fittings [Hot DIP GI] [3 KG] |
| 132 | Labour Charges for Fixing of 11KV Tapping Channel Arm [[Hot DIP GI] [15.774 KG] |
| 133 | Labour Charges for Fixing of HT Guy Insulator |
| 134 | Labour Charges for fixing of 11KV LAS Distribution Type |
| 135 | Labour Charges for fixing of Name Board Caution / Danger Board - 250 x 200 x 1.6mm Transportation of 40 Feet RSJ Poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) for a lead upto 5 KM Please Enable Macros to View BoQ information |