|
| 1 | Dismentalling of head assembly and re-jointing complete in all respect as per the direction of Engineer in charge. |
| 2 | Extracting of riser pipe including dismentalling complete of following dia with in all respect as per the direction of Engineer in charge. |
| 3 | 32mm dia |
| 4 | 65mm dia |
| 5 | Lowering of riser pipe including fitting complete of following dia with in all leads and lifts as per the direction of Engineer in charge. |
| 6 | 32mm dia |
| 7 | 65mm dia |
| 8 | Extracting of connecting rods 12mm dia complete with in all respect as per the direction of Engineer in charge. |
| 9 | Lowering of connecting rods 12mm dia complete with in all respect as per the direction of Engineer in charge. |
| 10 | Cutting/ Threading of riser pipe of following dia complete with in all respect as per the direction of Engineer in charge. |
| 11 | 32mm dia |
| 12 | 65mm dia |
| 13 | Cutting /threading of connecting rods 12mm dia complete with in all respect as per the direction of Engineer in charge. |
| 14 | Transpotation of material one site to another site of work complete in all respect as per the direction of Engg. In Charge. |
| 15 | Providing /Fixing of connecting rods 12mm.x 3mm electro galvanised complete in all respect as per the direction of Engineer in charge. |
| 16 | Providing /Fixing of seemluss sockets of following dia complete in all respect as per the direction of Engineer in charge. |
| 17 | 32mm dia |
| 18 | 65mm dia |
| 19 | Providing/Fixing lower valve complte India mark III india mark-II complete in all respect as per the direction of Engineer in charge. |
| 20 | Providing/Fixing of Cylinder Essembly India mark III india mark-II complete in all respect as per the direction of Engineer in charge. |
| 21 | Providing/Fixing of Chain with coupling complete in all respect as per the direction of Engineer in charge. |
| 22 | Providing/Fixing of SS Handle aide complete in all respect as per the direction of Engineer in charge. |
| 23 | Providing/Fixing of H T Botle M 10x40 complete in all respect as per the direction of Engineer in charge. |
| 24 | Providing/Fixing of Ball Bearing 6204 complete in all respect as per the direction of Engineer in charge. |
| 25 | Providing/Fixing of Hand Pump Rubber Cup Washer complete in all respect as per the direction of Engineer in charge. |
| 26 | Providing/Fixing of Body with liner complete in all respect as per the direction of Engineer in charge. |
| 27 | Re-development of bore with all complressor along with complete assembly complete in all respect as per direction of Engineer in charge. |
| 28 | Transporation of Compressor with assembly complete in all respect as per the direction of Engineer in charge. |
| 29 | Providing GMS Tube light class of following dia including tube fitting complete including testing of joints, within all leads and lifts. |
| 30 | 32mm da |
| 31 | 65mm dia Please Enable Macros to View BoQ information |