|
| 1 | Supply, installation, testing and commissioning of MNRE approved off Grid Solar Panels for running of motor pumps with 25 years of Linear Generation warranty, Work includes designing of solar panel area and MS frame and foundation on ground/roof of Pump house or CWR, showing arrangement of panel in available space, installation of PV module on MS frame as per approved design and drawings. Mounting structure shall be suitably design to withstand wind velocity up to 150km/hr. The work shall be executed as per detailed technical specifications, approved drawing and direction of Engineer in Charge. Note: There shall be 5 year service warranty for solar panel and mounting structure and suitable provision shall be included in tender document. |
| 2 | 10.6 Supply, installation, testing and commissioning of DC submerssible pump sets with inbuilt or individual solar pump controller with Maximum power point tracking (MPPT) for optimally use the solar panel and maximize water discharge to deliver maximum water during the day including PVC flat submersible cable from controller to motor pumps.Solar pump shall be of Stainless steel construction and performance shall be as per scope of work and minimum lift of water shall be as per defined in scope .Pump controller shall have Adequate protection against dry operation of motor pump set, and against hails and storms. Full protection against open circuit, accidental short circuit and reverse polarity should be provided. A good reliable on/off switch suitable for DC use is to be provided. The cable shall be ISI marked three core PVC flat submersible cable as per IS 694:1990 or amended up to date ( standard insulation) and conductor as per class 5 of IS 8130:1980 or amended up to date.The duty condition of pump set shall be as per scope of work and entire work shall be as per technical specification and direction of Engineer in charge.1.5 KW (2.0 HP) |
| 3 | Supply, installation, testing and commissioning of Remote monitoring unit on off grid solar controller for remote ON/OFF, parameter setting, monitoring and troubleshooting through mobile etc. complete. Web charges and data charges for 5 year during service warranty etc. complete in all respect as per technical specification and as per direction of Engineer. |
| 4 | 2.25 Providing & Lowering in tube well ISI marked HDPE pipe as per IS 4984:1995 or amended upto date in PE 80 grade and class PN 10 of following dia. including HDPE/GI fittings and PVC rope confirming to IS 5175:1992 or amended upto date, along with clamping of submersible cable etc. complete in all respect.40 mm dia |
| 5 | Supply & installation of GI pipe 32 mm medium class B with pipe sockets (heavy duty). |
| 6 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock |
| 7 | Providing and laying in position cement concretee including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 8 | Providing and laying in position cement concretee including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. |
| 10 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the billets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevant IS code) |
| 11 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting ( height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. |
| 12 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting ( height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. Add Extra if I/rail section is used |
| 13 | P & F G.I. pipes (Internal Work) with G.I. Fittings excluding union (IS:1239 Mark) & MS clamps including cutting and making good the walls and floors: Exposed on wall 15 mm dia nominal bore 'B' Class |
| 14 | P & F Push Cock superior quality, of approved make Synthetic Material (PTMT) push cock of approved quality/make 15mm. |
| 15 | P & F PVC Storage Tank ISI Marked (IS : 12701) indicating the BIS license No), of approved make with cover, 25mm dia 1M long G.I. over-flow pipe & 25 Cm. long wash out pipe with plug & socket, including making connection etc., complete of approved design: 5000litres capacity. |
| 16 | Supply & fixing G.I. Union ISI marked in G.I. pipe line as required complete in all respect of size : 32mm dia nominal bore |
| 17 | S & F M.S. clamp, set of 50 ×6mm flat iron with nuts and bolts etc. for holding the riser pipe assembly of submersible pump set. |
| 18 | 4.1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil Please Enable Macros to View BoQ information |