| 1 | SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR 2x600 MW CHENNAI - 600120 THERMAL POWER STATION BOOSTER FAN AND DUCTING SYSTEMINDIAN COMPONENTS |
| 2 | SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR2x600 MW CHENNAI - 600120 THERMAL POWER STATION BOOSTER FAN AND DUCTING SYSTEMFOREIGN COMPONENTS |
| 3 | ABSORBER / REACTOR SYSTEM INDIAN COMPONENTS |
| 4 | ABSORBER / REACTOR SYSTEM FOREIGN COMPONENTS |
| 5 | FABRIC/BAG FILTER SYSTEMINDIAN COMPONENTS |
| 6 | IFABRIC/BAG FILTER SYSTEMFOREIGN COMPONENTS |
| 7 | SEA WATER BASED, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEMINDIAN COMPONENTS |
| 8 | SEA WATER BASED, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEMFOREIGN COMPONENTS |
| 9 | BY-PRODUCT COLLECTION AND CONVEYING SYSTEMINDIAN COMPONENTS |
| 10 | BY-PRODUCT COLLECTION AND CONVEYING SYSTEMFOREIGN COMPONENTS |
| 11 | COMPRESSED AIR & PLANT WATER SYSTEMINDIAN COMPONENTS |
| 12 | COMPRESSED AIR & PLANT WATER SYSTEMFOREIGN COMPONENTS |
| 13 | HVAC & FIRE FIGHTING SYSTEMINDIAN COMPONENTS |
| 14 | HVAC & FIRE FIGHTING SYSTEMFOREIGN COMPONENTS |
| 15 | ELECTRICAL, CONTROL & INSTRUMENTATIONINDIAN COMPONENTS |
| 16 | ELECTRICAL, CONTROL & INSTRUMENTATIONFOREIGN COMPONENTS |
| 17 | SUPPLY OF MANDATORY SPARESSupply of Mandatory spares ( as specified in Volume VI)INDIAN COMPONENTS |
| 18 | SUPPLY OF MANDATORY SPARESSupply of Mandatory spares ( as specified in Volume VI)FOREIGN COMPONENTS |
| 19 | SUPPLY OF MISCELLANEOUS ITEMSSupply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the SpecificationINDIAN COMPONENTS |
| 20 | SUPPLY OF MISCELLANEOUS ITEMSSupply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the SpecificationFOREIGN COMPONENTS |
| 21 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksBOOSTER FAN AND DUCTING SYSTEM |
| 22 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksABSORBER / REACTOR SYSTEM |
| 23 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksFABRIC/BAG FILTER SYSTEM |
| 24 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksLIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEM |
| 25 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksBY-PRODUCT COLLECTION AND CONVEYING SYSTEM |
| 26 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksCOMPRESSED AIR & PLANT WATER SYSTEM |
| 27 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksHVAC & FIRE FIGHTING SYSTEM |
| 28 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksELECTRICAL, CONTROL & INSTRUMENTATION |
| 29 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksANY OTHER ITEMS |
| 30 | LOADING, TRANSPORTATION, INSURANCE CHARGES,UNLOADING Etc.Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservationcharges etc. for all E & M worksSUPPLY OF MANDATORY SPARES |
| 31 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEMAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES |
| 32 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCECIVIL & ARCHITECTURAL WORKS |
| 33 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEINFRASTRUCTURE WORKS |
| 34 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEIFGD FACILITIES |
| 35 | ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCEOTHER WORKS (Not covered in the above items but required to cover complete scope of works) |
| 36 | TYPE TEST CHARGESType Test charges for all Electro-Mechanical equipments |
| 37 | IMPARTING TRAININGImparting Training to Owner's personnal at project site |
| 38 | ANY OTHER ACTIVITY NOT LISTED ABOVEAny other activity not listed above but required for the safe and successful operation of the plant as per the scope of supply Please Enable Macros to View BoQ information |