| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means |
| 3 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick), etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid) |
| 4 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) |
| 5 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. |
| 6 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix |
| 7 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers |
| 8 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 20mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used , curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 10 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. |
| 11 | Supplying and painting the walls with two coats of cement paint as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications and as directed by the departmental officers. (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work). |
| 12 | Supply and delivery and fixing of 5000 Litre capacity HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., |
| 13 | Supply and delivery of 63mm dia 6 KSC PVC Pipe with IS specification etc., complete. |
| 14 | Earth work excavation and depositing on bank with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. |
| 15 | Lowering of 63mm dia PVC Pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste. |
| 16 | Add G.S.T. @ 18% Please Enable Macros to View BoQ information |