|
| 1 | Supply, fabrication and erection of embedded parts, shutter and hoisting |
| 2 | OD2623/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 3 | OD2620/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 4 | OD2619/2025-2026:Supply of MS round bar including cost of conveyance charges |
| 5 | OD2622/2025-2026:Fabrication and erection of Embedded Parts for canal shutters(Up To 2 Tonne<br>Weight) and accessories as per approved specifications, drawing and direction of deptl. officer at site<br>including cost of labour, machinery all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied. |
| 6 | OD2621/2025-2026::Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platfurm and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied |
| 7 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 8 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 9 | OD2618/2025-2026:Erection of the canal shutter (Up to 2 Tonne weight) /Hoist Bridge /Platform including hand rails . lader etc for the same including, alignment correcting and setting complete including cost of all labour, machinery , incidental and conveyance, lead and lift charges etc complete but excluding cost of material already supplied. |
| 10 | Centering shuttering and concreting |
| 11 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 12 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | Operating mechanism |
| 14 | OD2615/2025-2026:provinding EN Screw rod 7.50ton capacity 4M lift screw hoist having one number of EN8 screw shaft having a lifting speed of around 5.00cm/Min for 24rpm of hand operation including cost of all materials, labour, hire charges and conveyance |
| 15 | OD2617/2025-2026:SUPPLYING and APPLYING GREASE on NEW SCREW ROD for CANAL GATE |
| 16 | OD2624/2025-2026:Providing base and nut arrangement for hoisting the shutter including cost of all materials labour etc Please Enable Macros to View BoQ information |