| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 3 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 4 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 5 | Straightening one slanted 11kV pole after unbinding the line and binding the line after work. |
| 6 | Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work. |
| 7 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 8 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 9 | Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials. |
| 10 | Renewal of any type of existing damaged/old 11kV Strut with new A type strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole. |
| 11 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 12 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 13 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 14 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 15 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 16 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 17 | Erection of suspension clamp for 11KV ABC of any size |
| 18 | Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 19 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 20 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 21 | Renewing one V Cross arm on the 11kV Pole including dismantling and conveyance. |
| 22 | Renewing one 1.8m Channel cross arm on the 11kV Pole including dismantling and conveyance. |
| 23 | Renewal of existing damaged/old 11kV Fly stay with new Fly stay including renewal of A type pole in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole. Please Enable Macros to View BoQ information |