Name of Work:- Footpath and Other Allied Works at Bhaley Pool, Dalapchand Gram Panchayat under Lava Block, Kalimpong, GTA.
Sl. No.
Item Description
1
Earthwork in cutting to form road section in correct profile including removal of spoils not exceding initial lead of 50m and initial lift of 1.5m (iii) in mixed hard soil (i.e., hard moorum and soil containing laterite and boulders which do not require blasting)
2
Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. all complete. (a) Depth of excavation not exceeding 1.5 m.
3
Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (a) With earth obtained from excavation of foundation.
4
Removal of rubbish,earth etc from the working site and disposal of the same beyond the compound in conforming with the Muncipality/Corporation Rules for such disposal,loading into trucks and cleaning the site in all respect as per direction of Enginner in charge
5
Cement Concrete with graded stone ballast (30 mm size) excluding shutteirng. (B) In ground floor (with N.B. Variety Stone metal) (a) (1:3:6) proporaton
6
Stone Boulder 150 mm of N. Bengal variety
7
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth
8
Hire and Labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stoutprops and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns,lintels curved or straight including fitting & fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.