| 1 | Pipe Line Road Side Protection |
| 2 | 2.5.1.A:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By Manual Means (A) Lime Concrete |
| 3 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (D) Dry Rubble Masonry |
| 4 | OD13310/2025-2026:od1267459/2021_2022 :RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by the bund after completion of the work.etc.complete MODIFIED 60.1.2 |
| 5 | OD272373/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete ( Modified data 60.2.2) |
| 6 | OD274948/2025-2026:Coconut Pile - Supplying and stacking well matured straight coconut post for driving downthroug various strata bellow bed level including cost coveyance labour charges etc complete |
| 7 | OD534085/2024-2025:OD417905/2022-2023 (MD 60.64.4) MoRD - Coconut Pile - Driving down coconut pile to lines and levels through various strata using excavator and man coolie etc complete including all hire charges and labour for fixing and all other appliances necessary for pile driving down after pointing the bottom end |
| 8 | OD48982/2025-2026:OD417929/2022-2023 od1259113/2021_2022 :DR Packing under Foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at siteModified 60.7.2 |
| 9 | OD515429/2024-2025:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site ( Modified 60.7.8) |
| 10 | OD515440/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site (Modified 60.7.1) |
| 11 | OD272900/2025-2026: OD436151/2022-2023 Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade |
| 12 | OD272322/2025-2026:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material |
| 13 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 14 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Please Enable Macros to View BoQ information |