|
| 1 | Construction of open well |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 4 | OD158352/2022-2023:For first depth of 1.5m after initial depth of 1.5m ie between 1.5m &3m |
| 5 | OD158353/2022-2023:For 2nd depth of 1.5m after initial depth of 1.5m ie between 3-4.5m |
| 6 | OD158354/2022-2023:For 3rd depth of 1.5m after initial depth of 1.5m ie between 4.5 to 6.0m |
| 7 | OD158355/2022-2023:For 4th depth of 1.5m after initial depth of 1.5m ie between 6-7.5m |
| 8 | OD158356/2022-2023:For5th depth of 1.5m after initial depth of 1.5m ie between 7.5-9m |
| 9 | OD158357/2022-2023:For 6thdepth of 1.5m after initial depth of 1.5m ie between 9to 10.5m |
| 10 | OD158358/2022-2023:For 7th depth of 1.5m after initial depth of 1.5m ie between 10.5-12m |
| 11 | OD158359/2022-2023:For8th depth of 1.5m after initial depth of 1.5m ie between 12-13.5m |
| 12 | OD158360/2022-2023:For 9th depth of 1.5m after initial depth of 1.5m ie between 13.5to15.0m |
| 13 | OD158361/2022-2023:For 10th depth of 1.5m after initial depth of 1.5m ie between 15-16.5 |
| 14 | OD163049/2022-2023:For 11th depth of 1.5m after initial depth of 1.5m ie between 16.5-18m |
| 15 | OD129177/2023-2024:For 12th depth of 1.5m after initial depth of 1.5m ie between 18-19.50m |
| 16 | OD129178/2023-2024:For 13th depth of 1.5m after initial depth of 1.5m ie between 19.50- 21m |
| 17 | OD158362/2022-2023:Laterite masonry with neatly dressed laterite stone of size 35x20x20cm or nearest size cm 1:6 for well stening including cost of materials labour charges etc |
| 18 | OD158363/2022-2023:Laterite masonry with neatly dressed laterite stone of size 35x20x20cm or nearest in CM 1:6 for foundation and basement including all cost of materials labour charges etc. |
| 19 | 13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand) |
| 20 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc |
| 21 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 22 | OD170693/2022-2023:Supplying, installing, testing and commissioning of Open well submersible pump set 1.5 HP. |
| 23 | OD170694/2022-2023:Supplying and laying 2.5mm2 submersible pumo cable from nearby power point to Pump set cost including all materials and labour etc,,complete. |
| 24 | OD170703/2022-2023:Providing and fixing PVC Hose pipes 50 mm dia including fixing internal work- Exposed on wall. |
| 25 | 50.18.9.6.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 10Kgf/cm2 |
| 26 | 50.18.9.16.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 50 mm dia 10Kgf/cm2 - External work - Exposed on wall Please Enable Macros to View BoQ information |