| 1 | Cost Of Materials |
| 2 | 100.98.237:Supply of PVC Pipe, 10kg/cm2, 110mm Dia. |
| 3 | OD134152/2025-2026:Supply of 100 mm GI pipe |
| 4 | OD134216/2025-2026:Cost of PVC Specials |
| 5 | 100.98.429:Supply of CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.6, Size 100mm. |
| 6 | 100.98.449:Supply of CI Air Valve with Flanges, Conforming to IS 14845 - 2000, Kinetic Air Valve Type DS1, Size 50mm. |
| 7 | Working Charges |
| 8 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 9 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. |
| 10 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. |
| 11 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 12 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. |
| 13 | 15.43.1:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Water bound macadam road |
| 14 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. |
| 15 | 100.12.9:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 100mm diameter nominal bore. |
| 16 | OD135092/2025-2026:Conveying and fixing C.I Non return valves by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 100mm diameter, Class I. |
| 17 | 100.32.3:Conveying and fixing C. I. Double Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 50mm Double Acting Air Valve. |
| 18 | OD139557/2025-2026:Taking connection from the line of size upto 100/110 mm for connecting to the branch line using PVC/GI/MS Saddle or Tee and specials including cost of saddle / Tee, all labour charges, necessary earth work excavation and refilling, bailing out water, providing fencing and caution boards etc. but excluding cost of CID/CIR joints tail pieces and specials |
| 19 | 2.27:Supplying and filling in plinth with sand under floors, including watering, ramming consolidating and dressing complete. Please Enable Macros to View BoQ information |