|
| 1 | APPENDIX 1- Nellikkunnu BG |
| 2 | Rennovation work of Source 100.54.3.2 Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 6.0m by earth work excavation in or under water, after closing the inlet valves and plugging anyholes in the staining by engaging divers with breathing accessories, bailing out waterusing pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes,pulleys and buckets and disposing the same within minimum lead of 50 m from theperiphery of the well, including engaging coolies for scrapping the inner side of thewell, without causing any damages to the existing structures and installations,including hire and conveyance of tools and plant and as per the directions of thedepartment officers etc. complete. |
| 3 | 60.2.2Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump setincluding conveyance to site and erection,cost of fuel, lubrication oil and other stores,pay of staff etc complete |
| 4 | OD271168/2025-2026PUMP AND PANEL BOARD - PUMP AND ACCESSORIES,PANEL BOARDAND STARTER REPLACEMENT - Supplying and installing 10 HP OPENwellsubmersible pumpset with ISI mark and specifications with all accessories as per theduty condition confirming to relovent ISI specificaton and mark -including Oilimmersed Star Delta starter, 8K VAR Power capacitor, Single phase preventorCable 62.1 sqm, Earthing material, Pressure Guage with siphon and Valve, NR Valve, SluiceValve, Panel board of size 2.5 x 2 feet including volt meter; ammeter, selector switch,100A MCCB. 300MA ELCB, 63 o Fuse unit 3nos and panel board wiring with Nocables, Supply & Fixing MS supporting clamps. with Pump set erection chargesincluding welding the column pipes with flanges, bend and fitting valves includingthe cost of rubber mat, nuts, bolts, labour charge, conveyance charge etc |
| 5 | 100.98.428Supply of CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.6, Size80mm. |
| 6 | 60.7.1DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site |
| 7 | 100.98.1008Engaging Coolie |
| 8 | Pumping main 18.12.6 Providing and fixing G.I. pipes complete with G.I fittings including trenching andrefilling etc. External work50 mm dia nominal bore |
| 9 | 18.17.4Providing and fixing gun metal gate valve with C.I. wheel of approved quality(screwed end) :50 mm nominal bore |
| 10 | Rennovation of Reservoir 13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 11 | 13.48.1 Finishing with Deluxe Multi surface paint system for interiors and exteriors usingprimer as per manufacturers specifications:Two or more coats applied on walls @1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10sqm |
| 12 | Distribution Line 18.12.6 Providing and fixing G.I. pipes complete with G.I fittings including trenching andrefilling etc. External work50 mm dia nominal bore |
| 13 | 18.17.6Providing and fixing gun metal gate valve with C.I. wheel of approved quality(screwed end) :80 mm nominal bore Please Enable Macros to View BoQ information |