| 1 | Biju Santi Udyan |
| 2 | Supplying/ Repairing Fitting fixing of Rope light ( Cromption/ Bajaj or Similar Make ) T and P etcall complete. |
| 3 | Supplying/ Repairing Fitting fixing of Bollard light (Cromption/ Bajaj or Similar Make ) T and P etc all complete. |
| 4 | Supplying/ Repairing Fitting fixing of Tree Shape light (Cromption/ Bajaj or Similar Make ) T and P etc all complete |
| 5 | Supplying/ Repairing Fitting fixing of Dome Shape light ( Cromption/ Bajaj or Similar Make ) T and P etc all complete. |
| 6 | Supplying/ Repairing Fitting fixing of Flood Light( Cromption/ Bajaj or Similar Make ) T andP etc all complete. |
| 7 | Supplying/ Repairing Fitting fixing of Ring Shape Street light ( Cromption/ Bajaj or Similar Make ) T and P etc all complete. |
| 8 | Repair and maintenance of Biju Santi Udyan Signage |
| 9 | Fly Ash Brick (23x11x8cm) size having crushing strength not less than 75kg/ cm2 with cement mortar (1:6) in foundation and plinth per cum. |
| 10 | 12mm thick plaster (1:4) over brick work. |
| 11 | Priming one coat to wall surafce using water bound cement primer including cost, Conveyance all materilas, labour and T and P etc complete. |
| 12 | Painting Two coat with weather seal paint including cost, Conveyance all materilas, labour and T and P etc complete. |
| 13 | Supplying of M.S. Door, Window with grills, Grills made out of M.S. Angle frame, M.S. Flat, Sheet etc of approved section and design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour charges, carriage of materials to site etc.complete. |
| 14 | For Plantation. |
| 15 | For Cleanning of pond |
| 16 | Toilet at Khajuribandha |
| 17 | Earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum Scm to 7cim and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. |
| 18 | Filling in foundation and plinth with sand well watered and rammed including cost of all materials. |
| 19 | PCC(1:3:6) with 40 mm size CBHG metal including all cost of materials, labour, conveyance, royalty, T and P, water for curing etc all complete. |
| 20 | RCC work M-20 grade with 20mm and down grade black hard granite CB stone chips including hoisting and laying. (P-50/4) |
| 21 | Supplying, fitting and placing uncoated of SAIL TMT BAR reinforcement complete as per drawing and specification. |
| 22 | Fly ash bricks 25 cm x 12 cm x 8 cIm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in foundation and plinth including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items ofwork. |
| 23 | Fly ash bricks 25 cmx 12 cm x 8 cm size having crushing strength not less than 75 Kg'em2 in cement mortar (1:6) in super structure including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work |
| 24 | RCC foundation, plinth band and lootings bases of columns mass concrete pre |
| 25 | RCC LINTEL |
| 26 | RCC. Floor and Roof slabs, landings, balconies, projecting sub-shades, and chajjas upto 4.3Mheight |
| 27 | 6mm thick cement Plaster (1:4) RCC Surface finished smooth including closed deep shiping and slurry treatment. |
| 28 | 12 mm thick cement plaster (1:6) for brick work 179 |
| 29 | 16mn thick plaster (1:6) for brick masonry or stone masonry |
| 30 | Priming one coat with wall cement primer water bound on plaster surface. 160 |
| 31 | Finishing walls with water proofing weather coat paint of approved make including cost of caffolding staging charges with cost of all materials taxes, labour |
| 32 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade inculding cost of paint. 154 |
| 33 | Supplying all material , labour, T and P for fitting, fixing of PVC fibre door with frame inlud1ng all cost , nails etc. complete |
| 34 | Cost of Primer, Paint, Painting and Letter writing over Disply board 303 |
| 35 | Add clectrical fitings |
| 36 | Add phd fittings Please Enable Macros to View BoQ information |