| 1 | Provision of Electrical inquiry by providing one semi skilled manpower who will note down the complaints, forwarding the complaints to the maintenance perssonel, perusing the same for fast resolution of complaint and recording of compliance after attending the same i/c attending the minor complaint as per direction of Engineer in charge along with availability of required tools etc.complete as reqd.Note : Mininmum Wages with all the statutary requirement shall be ensured. |
| 2 | Dismantling 1.5TR/2TR window AC unit along with accessories and keeping all the dismantled items at desired location as per the directions of engineer in charge etc as required. |
| 3 | Dismantling 1.5TR/2TR Split AC unit along with refrigerant pipe lines, power cable and other accessories and keeping all the dismantled items at desired location as per the directions of engineer in charge etc as required. |
| 4 | ITC of 1.5/ 2.0 TR Split AC units at desired location, i/c fixing of refrigerant piping with insulation, drain pipe, flexible covering, power connections, testing, commissioning etc. complete as reqd. |
| 5 | 1.5/2.0 TR Split A.C. Units |
| 6 | Installation of 1.5/2TR window type A.C. in the existing window i/c modification and fixing suitable wooden frame, loading unloading etc complete as reqd |
| 7 | Servicing of following capacity Window / Split AC / water cooler Units including washing & cleaning of filters, complete unit i.e evaporator unit, condensor unit i/c oiling, greasing of motors, testing, commissioning etc. complete as reqd. |
| 8 | 1.5/2.0 TR Window/ Split A.C. Units & water cooler |
| 9 | Repairing & Testing of 1.5/2.0 TR Capacity Split AC Units, flushing the system, pressure testing with Nitrogen gas holding the pressure for 24 hours, vaccumising, removal of leakage in Indoor unit & out door unit including supply & charging of refrigerant gas (R-22/R-32/R-410) and oiling, greasing of motors, testing commissioning etc. complete as reqd. |
| 10 | Supply and topping up of refrigerant gas (R-22) in existing 1.5/2.0 TR capacity Split AC units, i/c tracing the leakage if any and rectfying the same, refinishing of refrigerant pipes, joints, testing & commissioning of A C unit etc. complete as reqd. |
| 11 | Replacement of following faulty motor with new copper wounded motor suitable for operation on single phase 230 V, A C supply in the existing Split/Window AC unit i/c removal of faulty motor, making electrical connections, testing, commissioning etc. complete as reqd. (M/s Crompton, Ashu or as per manufacturer recommendation) NOTE:- The motor shall be guaranteed for One Year |
| 12 | 1/8 HP Condenser Fan Motor |
| 13 | 1/4 HP Condenser Fan Motor/water cooler condensing fan motor |
| 14 | 1/35 HP Indoor Unit Fan Motor |
| 15 | 1/8 HP Double Shaft Fan/Blower Motor |
| 16 | Replacement of following defective/ unserviceable compressor in the existing Window / Split AC units with following new compressor suitable for operation on single phase, 50 Hz A C Supply i/c removal and re-installation of defective compressor, refrigerant piping & nut bolts of foundation, electrical connection and making connection with existing refrigerant pipe lines, brazing, electrical wire/ cable terminations, making joints (wherever required), testing, commissioning etc. complete as reqd. (NOTE:- Original Invoice and Test Certificate of the compressor shall be submitted.) |
| 17 | 1.5 TR Capacity Rotary Sealed Compressor (M/s Hitachi/ LG/ Voltas) |
| 18 | 2.0 TR Capacity Rotary Sealed Compressor (M/s Hitachi/ LG/ Voltas) |
| 19 | 1.5 TR Capacity Reciprocating Hermetically Sealed Compressor (M/s Hitachi/ Daikin / LG/ Voltas/Emerson) |
| 20 | 2.0 TR Capacity Reciprocating Hermitically Sealed Compressor (M/s Hitachi/ Voltas / LG/Emerson) |
| 21 | Supplying & fixing of Powder Coated prefabricated MS frame stand comprising of Two numbers bracket made of heavy duty MS Sheet to accommodate the Condenser (Outdoor) unit for fixing on the wall with suitable diameter and length of Anchor fast bolts and making good damages etc as per site requirement. |
| 22 | Replacement of existing faulty/unseriviceable 1.5 TR Indoor Units of Split AC Units by supplying new 1.5 TR Indoor Unit, suitable for operation on 230 V AC supply, complete with blower, cooling coil, filters, controls & all accessories and remote control, etc. complete as reqd. (Make : M/S Hitachi/ Blue Star/Carrier/Voltas/SS make) |
| 23 | Replacement of condesnsor coil of existing outdoor units of 1.5/2.0 TR split AC unit with new copper coil i/c removing the old coil nut bolt installing the new coil brazing testing commissioning etc complete as reqd. |
| 24 | Replacement of cooling coil 1.5/2.0 TR split AC unit i/c removong the old coil nut bolt fixing the new coil refrigerant piping brzing connetion testing commissioning etc as reqd. |
| 25 | Providing and fixing of 3mm thick ply wood in the existing window i/c cutting & fixing with the help of screws etc. complete as required. |
| 26 | Replacement /Fixing of following items in existing 1.5/2.0 TR capacity Split AC unit suitable for operation on Single phase, 240 Volt, AC Supply, testing, commissioning etc. complete as reqd. |
| 27 | Running capacitor 45 mfd/ 50+5 mfd |
| 28 | Starting Capacitor (120/150 mfd) |
| 29 | Copper wiring kit |
| 30 | Condensor Fan Blade (Transparent PVC/ Metallic) |
| 31 | Thermostat (Danfoss or Renutrol) |
| 32 | PCB repairing for remote control of A C unit |
| 33 | SITC of new PCB for remote control of AC unit |
| 34 | Supply/ Fixing of 3 Pin 20 Amp, 240 Volt AC Industrial Top plug |
| 35 | Supply/ Fixing of Remote Hand Set with enclosure |
| 36 | Hitachi |
| 37 | Gujral |
| 38 | S/Fixing 20 mm dia PVC drain pipe in recess or on surface for drainage of split AC units i/c connections etc complete as reqd. |
| 39 | S/Fixing PVC flexible pipe to cover the refrigerant pipes and power cables in the existing wall/on surface/ M S Tray with saddles, screws including S/F clamps etc. as required. |
| 40 | 50 mm Dia |
| 41 | S/Fixing of following size 1.1 KV Grade PVC insulated copper conductor flexible cable in the existing M.S. Tray/Surface/Wall including S/F saddles, screws, thimbles i/c making connections, testing etc. complete as required. |
| 42 | 3 Core 2.5 Sqmm |
| 43 | Pdg. & installing following size 22 Gauge of copper refrigerant pipe along with insulation including cutting bending, jointing, brazing , testing and commissioning etc as required. |
| 44 | 1/4 inch size nominal dia |
| 45 | 1/2 inch size nominal dia |
| 46 | 5/8 inch size nominal dia |
| 47 | Supplying and fixing of wall mounted relay operated line Voltage Stabilizer suitable to work for incoming main from 150 to 270 Volts, Output Voltage between 195 to 245 Volts of 4 KVA with High and Low Voltage cut-off and Time Delay Relay etc. complete as required. (M/S Bluebird/ Logicstat/Microtek make). |
| 48 | Repairing of existing faulty 4KVA/5KVA Voltage Stabilizer installead for window/split AC Units i/c replacement of faulty/burnt components such as PCB, Transformer, Voltmeter, TDR Switch etc., connections, testing etc. complete as reqd. |
| 49 | Replacement of existing faulty/unseriviceable 1.5 TR Outdoor Unit of Non Inverter Split AC Units by supplying new 1.5 TR Outdoor Unit having copper coils compatible with all brands Non Inverter ACs & Rotary/reciprocating compressors and R-22/ R-32 /R-410 refrigerant, suitable for operation on 230 V AC supply, complete with fan motor with blade, condensing coil, but without Compressor, controls & all accessories complete with fixing of existing compressor in the unit i/c brazing/welding/connections etc. as reqd. (Make : M/S Hitachi/ Blue Star/Carrier/Voltas/SS make) |
| 50 | Repairing of faulty 1.5 TR inveter type split AC with repairing of following item i/c dismantling, repairing and refixing , testing commissioning etc complete as reqd. |
| 51 | 1.5 TR Inverter SAC PCB card |
| 52 | 1.5 TR Inverter SAC Outdoor motor |
| 53 | 1.5 TR Inverter SAC Indoor motor |
| 54 | Note:-1. AC complaints are to be attended within 2 Hr. of its reporting otherwise penalty of Rs. 500/- per complaint will be levied. 2. The Agency has to submit police verification record & ID proof of each staff.3. The firm shall provide each staff with working cell phone.4. The staff may be deputed for duty as per instruction of concerned SDE (E)/JTO (E).5. Penalty shall be imposed in case of absence of any staff as per T & C of contract.6. The Estimated Rates are inclusive of GST / other Input Tax Credit (ITC) taxes as applicable & Freight Charges (Unloading & Stacking) etc., the contractor shall quote accordingly.7. The contractor shall provide correct tariff heads & other details to enable BSNL claim Input Tax Credit.8. The bidder who submits the offer with concessional Goods and Service Tax (GST) shall submit the proof of applicable concessional GST. In case the Concessional GST is not creditable to BSNL it should be included in the price of the goods/services.9. The FF & packing amount quoted shall not be subject to change after bid evaluation /ordering on account of change of copper, lead base price, change in duties & taxes of item etc.10. Bidder must mandatorily mention HSN & SAC numbers.11. Evaluation of bids: - The evaluation and comparison of responsive bids shall be done on the basis of Net cost to BSNL on the prices of the goods & Services (i.e. complete work) offered along with all applicable Taxes, packing Forwarding Freight & Insurance charges etc. exclusive of GST.Declaration by Bidder1. We hereby declare that in quoting the above prices, we have taken into account the entire credit on inputs available under the GST Act introduced w.e.f. 1 July 2017 and further extended on more items till date.2. We hereby certify that HSN/SAC shown in column 17 are correct & credit of GST for the amount shown in column 10 above are admissible as per GST Laws.Name of bidder:Seal of Company: GST No./(s) Please Enable Macros to View BoQ information |