| 1 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc complete., |
| 2 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete. |
| 3 | Supply of Cut Stone Pillar of size 0.15 x 0.15 x 2.10m |
| 4 | Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., |
| 5 | Supplying and Fixing Chain Link Fencing of 5cm x 5 cm x 10 gauge including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. |
| 6 | Supplying and Fixing Barbed Wire Fencing 12G, 2 PLY including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. |
| 7 | Supplying and fixing Shade Net (Green Net) for under construction of high rise building |
| 8 | supply and fixing of 40mm dia pipe including labour carges etc complete |
| 9 | supply and fixing of 25mm dia pipe including labour carges etc complete |
| 10 | PVC screw down tap heavy type 20mm dia |
| 11 | 25mm PVC Tee |
| 12 | 25mm PVC L |
| 13 | Supply and fixing nominal bore quartized bulb type sprinkler |
| 14 | Earthwork excavation for 25mm Dia pipe including laying and jointing all labour charges complete |
| 15 | Earthwork excavation for 40mm Dia pipe including laying and jointing all labour charges complet |
| 16 | Painting with approved enamal paint two coats with old iron work including cost and conveyance to site and all labour charges etc., complete |
| 17 | Provision for Main door rate includes all labour,Material and fixing charges all etc complete |
| 18 | Provision for Name Board |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |