| 1 | S.H: Earthwork |
| 2 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRD Technical Specification Clause 303.1. |
| 3 | SH: Box Culvert |
| 4 | Excavation for StructuresA. Without dewateringEarthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.I. Ordinary Soil(i) Upto 3 m depth |
| 5 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.I. Sand Filling |
| 6 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)(I) P.C.C grade M 10( using Jhama brick aggregate)(i) Nominal mix 1:3:6 |
| 7 | Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204. (including centering, shuttering, staging etc. but excluding reinforcement)VI) R.C.C grade M-25 i) upto 5 m height |
| 8 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. |
| 9 | Providing & laying reinforced cement concrete in superstructure as per drawings & MoRD technical specifications Clauses 800, 900, 1205.4 & 1205.5 (including centering, shuttering, staging etc. but excluding reinforcement).II. R.C.C M 251. For height upto 5 m |
| 10 | Supplying, fitting, & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in superstructure complete as per drawing & MoRD technical specifications Clauses 1002, 1010 & 1202. |
| 11 | Providing & laying filter media with jhama brick aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and MoRD technical specification clause 1204.3.8. |
| 12 | Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRD technical specification clauses 614, 709, 1204.3.7. |
| 13 | Providing and fixing in position Drainage spouts complete as per drawing & MoRD technical specifications Clause 1209. Note:- Rate is inclusive of cost of steel grating and 1.00 m GI pipe of 100 mm dia. |
| 14 | S.H: Granular Sub-bases, Bases (Non-Bituminous) and Shoulders |
| 15 | Granular Sub-base with Well Graded Material (Table 400.1) using Jhama Brick Aggregate(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material (Jhama Brick Aggregate, Grading-I, as per Table 400.1, spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401.(i) For Grading - I Material (jhama brick aggreate) |
| 16 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate1) WBM Grading 2Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 2 as per MoRD Technical Specification Clause 405.(A) By Manual Means |
| 17 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate2) WBM Grading 3Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 2 as per MoRD Technical Specification Clause 405.(A) By Manual Means |
| 18 | S.H: Bases and Surface Courses (Bituminous) |
| 19 | Prime Coat(ii) Medium porosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.20 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502. |
| 20 | Tack Coatiii. Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503. |
| 21 | 25 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 25 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.Case - II By Mechanical Means(I) Bitumen of VG-30 |
| 22 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.A. By Manual MeansCase - II : Type B (I) Bitumen of VG-30 |
| 23 | S.H: Road side Pucca drain |
| 24 | Construction of road side pucca drain with M10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. Excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement) C. Trapezoidal drain (top clear width 600 mm, bottom clear width 300 mm and clear depth of 600 mm)I. In Ordinary Soil Please Enable Macros to View BoQ information |