| 1 | Earth Work in Cutting/Filling for making required Bed & slope including all lead and lift, T&P in all types of soil as directed by Engineer-in-Charge including spreading dressing and compaction. |
| 2 | Supplying & Laying New EC Bag 50 kg > 72 gm weight filled with Local sand in Nylon crate size 1.00 x1.00 x1.00 m including all lead and lift, T&P as directed by Engineer-in-Charge. |
| 3 | Supplying & Laying Geotextile sheet made of 240 G.S.M. woven multifilament polypropylene yarn below pitching including cost of all material, T&P as directed by site incharge. |
| 4 | Supplying & Laying Local sand as a filter over Geo Textile Sheet & below Stone boulder pitching on slope including cost of all material, T&P as directed by Engineer-in-Charge. |
| 5 | Supplying & Laying of Geo bag (size 1.00x0.75) in gabion size 1.80x1.80x0.50 m in launching apron including cost of all material ,labour,T&P etc Complete. |
| 6 | Supplying & Laying Stone boulder upto 25 kg to 40 kg weight in Mechanically Woven Double Twisted Hexagonal shaped BIS standard class 2 as per IS code 16014 :2024 of required sizes 3.00x1.00x0.45 mesh size 10cm x 12 cm Slope Pitching in slope including cost of all material, T&P excluding cost of G.I. wire crate as directed by Engineer-in-Charge. |
| 7 | Supply of Mechanically Woven Double Twisted Hexagonal shaped BIS standard class 2 as per IS code 16014 :2024 of required sizes 3.00x1.00x0.45 m ( 2no.diaphragms size 1.00x0.45 m across the length of gabion ) mesh type 10.00 x12.00 cm polymer (PVC /PA6/Other advance polymers ) coated, Mesh wire dia 2.7/3.7 mm (ID/OD),edged / selvedge dia 3.4/4.4 mm(ID/OD) with partitions at every 1 m interval and shall have minimum 10 no. of opening per mtr of mesh perpendicular twist tying with lacing wire of dia 2.2 /3.2 mm (ID/OD) including cost of all material, T&P as directed by Engineer-in-Charge. |
| 8 | Providing & laying PCC in 1:3:6 CM with coarse sand & stone agregate in 20 to 40 mm size For Rain chute including cost of all material ,labour,T&P etc. |
| 9 | Centering & shuttering for Concrete work including cost of all material ,labour,T&P etc. |
| 10 | Ist Class Brick Work in Cement Mortar 1:4.with coarse sand including cost of all material ,labour,T&P etc. |
| 11 | 12.50 mm thick Cement Plaster in 1:4 CM with coarse sand including cost of all material ,labour,T&P etc. |
| 12 | Supplying, carriage, cutting, bending, binding & placing steel reinforcement including cost of all materials, labour, T&P etc required for proper completion of work. |
| 13 | Providing & Laying RCC 1:1.5:3 including cost of all materials, labour, T&P etc required for proper completion of work. |
| 14 | Supplying & Laying Stone boulder upto 25 kg to 40 kg weight boulder without wire crate in cutters including cost of all material, T&P excluding cost of G.I. wire crate as directed by site incharge.For Traingular Portion. Please Enable Macros to View BoQ information |