| 1 | PART-A (Material) |
| 2 | Following Materials Supplied by the Contractor :- |
| 3 | Stone pad. |
| 4 | Earth Wire Clamp with Nut & Bolts. |
| 5 | Clamp for Top/T-off/Dropper. |
| 6 | Suspension Clamp. |
| 7 | Dead end Clamp. |
| 8 | Eye Hook. |
| 9 | Eye Hook Clamp. |
| 10 | X-Arm Holding Clamp. |
| 11 | Red Oxide Paint. |
| 12 | Alluminium Paint. |
| 13 | F-Bracket. |
| 14 | PG Clamp |
| 15 | Guarding Angle Clamp. |
| 16 | Barbed Wire G.I. |
| 17 | Stay Loop Insulator/Guy Insulator. |
| 18 | Bolts, Nuts & Washers all sizes. |
| 19 | L.T. Connector (Pearcing). |
| 20 | Safe carriage/cartage of following items from Store Centre, Sultanpur to work site including loading, unloading and proper stacking (distance within 0-70 Km.) |
| 21 | Safe carriage of STP 09 Mtr. Long. |
| 22 | Safe carriage of STP 11 Mtr. Long. |
| 23 | Safe carriage of PCC Pole 8.5 Mtr. Long. |
| 24 | Safe carriage of PCC Pole 09 Mtr. Long. |
| 25 | Safe carriage of PCC Pole 11 Mtr. Long. |
| 26 | Safe carriage of ACSR Weasel Conductor/Dog Conductor. |
| 27 | Safe carriage of ACSR Rabbit Conductor. |
| 28 | Safe carriage of HT XLPE Cable Al. 3x70/3x120/3x185/3x240/3x300 sq.mm. |
| 29 | Safe carriage of LT ABC 1 Phase/3 Phase. |
| 30 | Safe carriage of Meter Qubical. |
| 31 | Safe carriage of CT/PT Combinud Unit. |
| 32 | Safe carriage of T/F 25 KVA. |
| 33 | Safe carriage of T/F 63 KVA. |
| 34 | Safe carriage of T/F 100 KVA. |
| 35 | Safe carriage of T/F 250 KVA. |
| 36 | Safe carriage of T/F 400 KVA. |
| 37 | Safe carriage of Other Line Materials. |
| 38 | Dragging of STP 09 Mtr. Long from site to pit point. |
| 39 | Dragging of STP 11 Mtr. from site to pit point. |
| 40 | Dragging of PCC Pole 8.5 Mtr. from site to pit point. |
| 41 | Dragging of PCC Pole 09 Mtr. from site to pit point. |
| 42 | Dragging of PCC Pole 11 Mtr. from site to pit point. |
| 43 | Fabrication & errection of Single Pole 09 Mtr support on STP including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 44 | Fabrication & errection of Single Pole 11 Mtr support on STP including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 45 | Fabrication & errection of double pole 11 Mtr support on STP including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 46 | Fabrication & errection of single pole support on PCC pole 8.5 Mtr. including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 47 | Fabrication & errection of double pole support on PCC pole 8.5 Mtr. including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 48 | Fabrication & errection of single pole support on PCC pole 09 Mtr. including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 49 | Fabrication & errection of single pole support on PCC pole 11 Mtr. including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 50 | Fabrication & errection of double pole support on PCC pole 11 Mtr. including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 51 | Grouting of Structure by digging od pit 1.83 Mtr. Deep for 09 Mtr STP/09 Mtr PCC foundation is provided with help of steel or wooden formers, groutung with 1:4:5 Ratio cement, sand & first class brick ballast 0.285 cu mtr for 09 Mtr STP plinthing/Muffing 0.3 Mtr above G/L and Proper plastering as per RESPO norms. |
| 52 | Grouting of Structure by digging od pit 1.83 Mtr. Deep for 11 Mtr STP/11 Mtr PCC foundation is provided with help of steel or wooden formers, groutung with 1:4:5 Ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 Mtr STP plinthing/Muffing 0.3 Mtr above G/L and Proper plastering as per RESPO norms. |
| 53 | Grouting of Structure by digging od pit 1.83 Mtr. Deep for 8.5 Mtr PCC Pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 Ratio cement, sand & first class brick ballast 0.285 cu mtr for 8.5 Mtr PCC Pole plinthing/Muffing 0.3 Mtr above G/L and Proper plastering as per RESPO norms. |
| 54 | Earthing of 09/11 Mtr STP & 8.5/09/11 Mtr PCC Pole as per RESPO norms. |
| 55 | Stay Complete With Concreating as per RESPO norms. |
| 56 | Laying Stringing & sagging of New ACSR Weasel Conductor/Dog Conductor including binding jumpering etc as per RESPO norms. |
| 57 | Laying Stringing & sagging of New ACSR Rabbit Conductor including binding jumpering etc as per RESPO norms. |
| 58 | Digging of Trench & Laying of cable HT XLPE cable 3x70/3x120/3x185/3x240/3x300 sq.mm including sands & brick as per RESPO norms. |
| 59 | Hanging Hosting & clamping and G.I. Pipe Channel nut & Bolts 3x70/3x120/3x185/3x240/3x300 sq.mm XLPE HT Cable (Cost of all accessories will be borne by contractor) as per RESSPO Norms. |
| 60 | Installation and Fixing of Heat Shrinkable Type HT Cable joiting Kit 3x70/3x120/3x185/3x240/3x300 sq mm XLPE Cable Box as per norms as per RESPO norms. |
| 61 | High Pressure testing after completion of laying of HT XLPE cable, Fixing of joints & termination. (Testing equipment shall be arranged by the contractor) as per RESPO norms. |
| 62 | Making cable jointing kit I/D & O/D 3x70/3x120/3x185/3x240/3x300 sq.mm as per RESPO norms. |
| 63 | Installation of Meter Qubical as per RESPO norms. |
| 64 | Installation of CT/PT Combinud Unit as per RESPO norms. |
| 65 | Route Cable Marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with Notice \\"High Voltage U/G Line\\" Painted on it (All the material, Manpower and T&P will be arranged by the contractor at his own cost) as per RESPO norms. |
| 66 | Road Restoration Charges for Pucca Road Crossing as per RESPO norms. |
| 67 | Road Restoration Charges for Footpath Side as per RESPO norms. |
| 68 | Laying Stringing & sagging of LT ABC 1x95+1x16/3x50+1x35+1x16/1x25+1x16 sq.mm. as per RESPO norms. |
| 69 | Laying Stringing & sagging of LT ABC 3x120 as per RESPO norms. |
| 70 | Erection and mounting of 25 KVA T/F. as per RESPO norms. |
| 71 | Erection and mounting of 63 KVA T/F. as per RESPO norms. |
| 72 | Erection and mounting of 100 KVA T/F. as per RESPO norms. |
| 73 | Providing and installation of SMC Box for 25 KVA To 100 KVA. as per RESPO norms. |
| 74 | Installation of 250/400 KVA T/F on plinth. as per RESPO norms. |
| 75 | Construction of plinth for 250/400 KVA T/F including of all material with Specification the plinth construction requires a 150 mm concrete slab below the channel, with brickwork beneath it. The total height of the plinth should be 1200 mm. All configurations are as follows: 1500 mm*1500 mm*1200 mm as per RESPO norms. |
| 76 | Fencing work suitable of 250/400 KVA T/F plinth of size 15x12x8 and angles of suitable size should be grouted on all 04 corners and 01 side for gate. Gate will also be constructed and Jali for fencing of size 1\\" of Burfi Shape as per RESPO norms. |
| 77 | Supply and Installation of Tail less Fuse Unit 300/500 amp., Al. Lug 400 mm. & L- Clamp (Copper) with structure and associated work For 250/400 KVA Transformer as per RESPO norms. |
| 78 | Work of wrapping of Plastic sheet around the ST Pole up to 2.5 meter hight form ground level (All the material, Manpower and T&P will be arranged by the contractor at his own cost). as per RESPO norms. |
| 79 | Erection and Commissioning of Three Phase Distribution Box with help of clamps as per norms. (Cost of clamps, nut & bolts shall be borne by the contractor and Distribution Box Provided By Department). as per RESPO norms. |
| 80 | Suply & Erection Danger Board (All the material, Manpower and T&P will be arranged by the contractor at his own cost). as per RESPO norms. |
| 81 | Erection of Barbed Wire G.I. as per RESPO norms. |
| 82 | Tree Branch Chopping. as per RESPO norms. |
| 83 | Guarding Between poles. as per RESPO norms. |
| 84 | Dismentalling of old conductor and ST Pole from HT/LT Line including cartage, loading unloading & proper stacking from work site to store center sultanpur. as per RESPO norms. |
| 85 | Pipe Earthing of 250/400 KVA Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms. |
| 86 | Pipe Earthing of Meter Qubical (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms. |
| 87 | Providing and fixing & Crimping of Al. Lug required size. as per RESPO norms. Please Enable Macros to View BoQ information |