Name of Work:- Construction of Zbzarpa-Chan Khul Ayet Hagnis RD 190-600 Mtr (Under CAPEX)
Sl. No.
Item Description
1
Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge
2
All Kind of Soil 70%
3
Ordinary Rock 20%
4
Hard Rock (B.P) 10%
5
Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m
6
All Kind of soil 70%
7
Ordinary Rock 20%
8
Hard Rock (B.P) 10%
9
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing complete.
10
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement: 2 coarse sand (zone-III) derioved from natural sources: 4 graded stone aggregate 20mm nominal size derived from natural sources)
11
Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness
12
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
13
Cement concrete flooring 1:2:4 (1cement:2coarse sand: 4graded stone aggregate finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps extra complete 40mm thick with 20mm nominal size stone aggrgates.
14
Dumping of stone in horizontal level excluding cost of stone
15
Providing irrigation water facilities / Regularities of water to public for cultivation by pipes or any other means.
16
Disposal of excavated eavailable earth from cutting, lead upto 1KM Head Load including loading unoading and stacking etc complete.
17
Carriage of material from source to site of work including loading unoading and stacking etc complete.
18
(i)(Sand / stone.) by an avg lead of 25 Km by MT 300 Mtr by Head load
19
(ii)Cement by an avg lead of 95 Km by MT 300 Mtr by Headload Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.