| 1 | Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1,5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr including disposal of excavated earth upto 1.00 Mtr from cutting edge, disposed earth to be leveled and neatly dressed. |
| 2 | All Kind of Soil |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering, All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand: 6graded stone aggregate 20 mm nominal size (Nallah) |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for; Retaining walls, return walls, walls (any thickness) |
| 5 | Cement concrete flooring 1:2:4 (1cement:2 course sand:4 graded stone agregade) finished with a floatin coat of neat cement including cement slurry ,but excluding soct of nosing of steps etc. complete 50mm thick with 20mm nominal size stone agregate Crushed |
| 6 | Dumping stones in horizontal level including cost of stone |
| 7 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:2:4 (1 cement 2 course sand and 4 graded crushed stone agg. 20mm nominal size. |
| 8 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. |
| 9 | providing and fixing of 200 mm dia. MS Pipe including carriage upto to site all complete job as per the direction of site engineer |
| 10 | Carriage of materials from sources to actual site of work including loading, unloading and stacking etc complete. |
| 11 | (i) stone of an avg lead of 500Mtr by Headload |
| 12 | (ii) Aggregate + sand for an avg lead of 20 Km's by MT |
| 13 | (iii) Cement + steel for an avg lead of 20 KM by MT Please Enable Macros to View BoQ information |