| 1 | Maintenance of Panchayat Well |
| 2 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar |
| 4 | OD398597/2025-2026:(OD generated with 100.3.3.20.) Earthwork in open well excavation (in or under water) for wells of diameter above 2.5m and up to 3.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from18.00m up to 19.5m including neat banking. |
| 5 | OD546976/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (For depth 18 m to 19.5m depth rate is 12 times of rate DAR 2.26.1) |
| 6 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 7 | OD393195/2025-2026:Laterate masonry for well lining with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 including all cost of materials, labour charges etc. |
| 8 | OD545325/2024-2025:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for well lining including all cost of materials, labour charges etc. using deptl stone |
| 9 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. |
| 10 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge |
| 11 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 12 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 13 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 14 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 15 | 10.25.1:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete |
| 16 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 17 | OD544712/2024-2025:Supplying and filling the gap between the well with stone aggregate of 10 mm nominal size as filter media including all cost of material ,labour charges etc. |
| 18 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade |
| 19 | OD547250/2024-2025:Providing and laying 60 mm thick factory made cement concrete interlocking paver blockmade by block making machine with strong vibratory compaction, of approved size, design& shape, laid in required colour and pattern over and including 50 mm thick compactedbed of 6mm metal , filling the joints with fine sand etc. all complete as per the direction ofEngineer-in-charge. Please Enable Macros to View BoQ information |