|
| 1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : |
| 2 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 3 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 4 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 5 | 12 mm cement plaster of mix : |
| 6 | 1:4 (1 cement: 4 fine sand) |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 8 | Two or more coats on new work. |
| 9 | Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank, including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba, all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) |
| 10 | Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i) Tank shall be emptied of water by pumping & bottom shall be cleaned of slit and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge. |
| 11 | Erection of single layer bamboo-scaffolding made of average 75 mm dia bamboos with adequate bracing, ties, ropes etc. for strong, stable and workable scaffolding for specified jobs ( above GF beyound 4.00m height) like replacement of sewage/ RW pipes & accessories, repairs to plasters, R.C.C fins, replacement of glass panes, uprooting/ cutting of tree saplings etc including dismantling the scaffolding after the job is done and clearing the site complete as per the direction of the Engineer-in-charge. [ Projected area of scaffolding frame work on buiding elevation to be measured for payment] |
| 12 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. : Internal work - Exposed on wall |
| 13 | 50 mm nominal outer dia. Pipes. |
| 14 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : |
| 15 | 50 mm nominal bore |
| 16 | Providing and fixing tank connector in PVC water tank as per direction of Engineer-in-charge. |
| 17 | 50 mm Please Enable Macros to View BoQ information |