| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil: |
| 2 | Supply and filling of Khak bajri/RBM filling including spreading, watering, ramming, compacting with PRR of 8 to 10 Tonne capacity including carriage of the same from approved source upto site of work complete (for Berm) all complete. |
| 3 | Supply, stacking and laying of WBM grade 2nd with specified graded stone aggregate 63mm - 45mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. |
| 4 | Supply, stacking and laying of WBM grade 3rd with specified graded stone aggregate 53mm – 22.40mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. |
| 5 | Providing/ laying and embedding of R.C.C. pipes incld. trench excavation in all status of surface to required width/depth and making of necessary cushioning with required material jointing of pipes all inclusive cost and carriage of pipes upto site of work complete Including carriages complete 9\\" dia RCC Pipes. |
| 6 | Providing/ laying and embedding of R.C.C. pipes incld. trench excavation in all status of surface to required width/depth and making of necessary cushioning with required material jointing of pipes all inclusive cost and carriage of pipes upto site of work complete Including carriages complete 12\\" dia RCC Pipes. |
| 7 | Construction of Edge/Wall |
| 8 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil complete. |
| 9 | P/L, of dry stone soling duly hand packed for foundation ,footings, floors etc with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete. |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all complete. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc complete. |
| 13 | P/F of 75mm PVC pipes of required length for weep holes including cutting and placing in position complete. |
| 14 | Supply & filling of Nallah boulders/GSB duly hand packed for back filling behind R/Wall including ramming, compacting, all inclusive leads, lifts, loading, un-loading, cost and carriage of materials from approved nearest source to site of work complete. |
| 15 | Carriage of Material :- Stone agg. 40mm for an avg lead of 10 Kms |
| 16 | Stone agg. 20mm for an avg lead of 10 Kms |
| 17 | Sand for an avg lead of 15 Kms Please Enable Macros to View BoQ information |