| 1 | Clearing the boundary line of the plantation as well as Dumping Depot to a width of 5.2M and Fire tracing cleared boundary of the plantation as well as Dumping Depot by scraping 1.8M on either side and burning centre belt (5 km in plantation and 1 km in dumping depot) |
| 2 | Contractors profit @ 10% |
| 3 | Felling, conversion, classification including dressing drag holding wherever necessary for 1/2 Cum & below for hard wood (teak poles excluded) |
| 4 | Contractors profit @ 10% |
| 5 | Felling, conversion, classification including dressing drag holding wherever necessary for 1/2 Cum & above for hard wood |
| 6 | Contractors profit @ 10% |
| 7 | Cross cutting timber with saw below 125cm in girth |
| 8 | Contractors profit @ 10% |
| 9 | Cross cutting with saw 125cm to 150cm in girth |
| 10 | Contractors profit @ 10% |
| 11 | Cross cutting with saw above 150cm in girth |
| 12 | Contractors profit @ 10% |
| 13 | Providing axe man for felling poles |
| 14 | Contractors profit @ 10% |
| 15 | Conversion and classification of 2nd class teak poles |
| 16 | Contractors profit @ 10% |
| 17 | Conversion and classification of 3rd class teak poles |
| 18 | Contractors profit @ 10% |
| 19 | Conversion and classification of 4th class teak poles |
| 20 | Contractors profit @ 10% |
| 21 | Conversion and classification of 5th class teak poles |
| 22 | Contractors profit @ 10% |
| 23 | Chisel numbering of timber logs, inferior timber logs, teak poles |
| 24 | Contractors profit @ 10% |
| 25 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. Detailed3000 m x 3 m = 9000 m2Rate21.15/m2 with 41.53% cost index ie 29.93 / m2 |
| 26 | Contractors profit @ 10% |
| 27 | Rough stone dry packing for chappaths, gutters & slushy portion of road |
| 28 | Contractors profit @ 10% |
| 29 | Construction of drag path |
| 30 | Contractors profit @ 10% |
| 31 | Haulage of III nd class poles up to an average lead of 400m |
| 32 | Contractors profit @ 10% |
| 33 | Haulage of IV th class poles up to an average lead of 400m |
| 34 | Contractors profit @ 10% |
| 35 | Haulage of V th class poles up to an average lead of 400m |
| 36 | Contractors profit @ 10% |
| 37 | Mechanical Dragging of timber and II nd class poles from stump site for an initial lead of 200m |
| 38 | Contractors profit @ 10% |
| 39 | Mechanical Dragging of timber and II nd class poles from stump site for an additional lead of 200m |
| 40 | Contractors profit @ 10% |
| 41 | Loading timber and poles from plantation staked within 20m radius into the vehicle and tying with ropes |
| 42 | Contractors profit @ 10% |
| 43 | Transport of timber in Lorries to Thalakode Depot ( lead- 3 km coupe road, 7 km Metal Road and 23 Km normal road, Total- 33 km) For first 10 km (Coup road 3 km -39.87 @ 33% enhancement 13.15 (39.87+ 13.15=53.02 +7 km normal rate) ie 53.02+93.03=146.05/-, next 15 km @8.78 = 131.70/- next 8 km @ 7.10=69.68Total - 146.05+131.70+69.68=347.43/m3/km |
| 44 | Contractors profit @ 10% |
| 45 | Transport of teak poles in lorry to dumping depot at1992 TP (Minimum Lead, 3 km coupe road ) First 4 km 33.33 % enhancement = 70.88 /km/m3 |
| 46 | Contractors profit @ 10% |
| 47 | Unloading timber at Govt.Depot and poles at dumping depot |
| 48 | Contractors profit @ 10% |
| 49 | Clearing stacking site including dumping site. |
| 50 | Contractors profit @ 10% |
| 51 | Stacking teak poles at dumping depots |
| 52 | Contractors profit @ 10% |
| 53 | Billeting and stacking at site for teak/hardwood firewood and teak billets excluding felling |
| 54 | Contractors profit @ 10% |
| 55 | Transport of teak billets and teak/hardwood firewood by headload 20m up to 200m |
| 56 | Contractors profit @ 10% |
| 57 | Loading teak firewood and teak billets in lorries |
| 58 | Contractors profit @ 10% |
| 59 | Transport of Teak firewood , billets in lorries to 1992 TP dumping depot (Minimum Lead, 3 km coupe road ) First 3 km 33.33 % enhancement = 70.88/m3 |
| 60 | Contractors profit @ 10% |
| 61 | Unloading and stacking of teak firewood , billets and misc. firewood pachilla Dumping Depot |
| 62 | Contractors profit @ 10% |
| 63 | Knife weeding in moderate weed growth area during Aug-Sept- Allowed subjedt to site inspection by CCF |
| 64 | Contractors profit @ 10% |
| 65 | Construction of temporary shed with jungle wood post and thuching with grass to accommodate staff,labours and watchers and keeping implements etc. |
| 66 | Contractors profit @ 10% Please Enable Macros to View BoQ information |