Tender For Negoo Jabbad Road. - Engagement Of Jcb For Clearance Of Humps Wild Grass, Undulations, Etc And Disposal Of Same Outside Municipal Limits As Directed By Site In-Charges Engineer. Earth Work In Bulk Excavation By Mechanical Means (Hydraulic Excav, Chadoora-Jammu And Kashmir
TDR : 54484375
Tender Notice
BOQ
3 Days Left
Chadoora
Jammu and Kashmir
Tender For Negoo Jabbad Road. - Engagement Of Jcb For Clearance Of Humps Wild Grass, Undulations, Etc And Disposal Of Same Outside Municipal Limits As Directed By Site In-Charges Engineer. Earth Work In Bulk Excavation By Mechanical Means (Hydraulic Excav
Engagement of JCB for clearance of humps wild grass, undulations, etc and disposal of same outside municipal limits as directed by site in-charges Engineer.
2
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
3
Providing & Laying of Stone Soling tightly hand packed including watering, ramming and all other carriages, complett job
4
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
5
Random Rubble masonry with Quarry stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand)
6
Dry random rubble masonry with Quarry stone in foundation and plinth With bond stone
7
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
8
Carriage of materials by MT from source to site of work including loading unloading complete.
9
stone Agg. for an avg. lead of 38 Km
10
sand for an avg. lead of 34 Km
11
Stone for an avg lead of 38 kms Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.