|
| 1 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 |
| 2 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying ofinter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge.16.94.1 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)..20% boulder |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with..1:1.5:3 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 7 | Foundations, footings, bases for columns |
| 8 | Suspended floors, roofs, landings, balconies and access platforms. |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 10 | Consumption/carriage of materials |
| 11 | a) Sand for 120 KM by MT |
| 12 | b) Stone agg. for 10 KM by MT |
| 13 | c) Stone for an. Avg dist of 10 km by mt Please Enable Macros to View BoQ information |