| 1 | Sewage treatment and disposal Facility |
| 2 | Designing, providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of 2.0 MLD Sewage treatment plant based on Cyclic Activated Sludge Process technology and 2.0 Mld Tertiary Treatment plant in M30 RCC grade consisting of Raw sewage pumping Inlet Chamber, Screen Chamber, Detritus Tanks, Distribution Chamber/box and Biological CASP Basins tank, Sludge Sump, Centrifuge house, Chlorine Contact Tank, Chlorinator Room/Shed, Sludge Centrifuge, Including tertiary treatment plant of 2 Mld Capacity based on fibre Disc filter technology including necessary piping work for the secondary and tertiary treatment plant with required valves, gates, drains, pathways, Administration Block cum Laboratory, Laboratory Equipments, Tools and Plants, Spare Parts, Internal roads, approach road to STP, compund wall, Peripheral retaining wall around, DG platform, Storm water drains, security cabin, etc. complete as turnkey job with all involved civil, electrical and mechanical works inclusive of following items, units as per detailed specification for civil, electrical and mechanical components with all duties and taxes, etc. complete to achieve BOD < 5 ppm, COD < 100 ppm, TSS < 5 ppm, to get recyclable quality of water for industrial / agricultural purposes, fire fighting, gardening etc. Plant is designed for N, P outlet parameters shall also include TN < 10 ppm, NH3N < 1 ppm and TP < 1 ppm) |
| 3 | Construction of retaining wal at property boundary adjoining Nullah Side |
| 4 | Earth work excavation and depositing on bank with an initial lead of 10 m & lift of 2 m for depths in hard stiff clay, stiff black cotton, hard red earth, shales murum, gravel, stony earth and earth mixed with small size of boulders etc all complete as per standard specification as directed by the Departmental Engineer. |
| 5 | a) For 0 to 2 m depth |
| 6 | Earth work excavation and depositing on bank with an initial lead of 10 m & lift of 2 m for depths in hard stiff clay, stiff black cotton, hard red earth, shales murum, gravel, stony earth and earth mixed with small size of boulders etc all complete as per standard specification as directed by the Departmental Engineer. |
| 7 | for 2 to 3 m depth |
| 8 | Supplying and laying of Reinforcement Cement Concrete of M30 grade using machine crushed hard broken granite stone jelly 20 mm for RCC works in all types of foundations floor slabs of all shapes (Excluding cost of providing centering & fabrication of reinforcement which shall be measured and paid under seperate items) including curing, complying with standard speifications as directed by the Departmental Engineer using sulphate resistant cement. |
| 9 | Providing and laying base concrete in foundation using Plain Cement Concrete 1:3:6 As base course (40 mm) including consolidation and levelling etc as per standard specifications |
| 10 | Supplying & erecting centering for sides & walls of chamber including supports & strutting for plain surfaces with all cross bracings using 25 mm thick boards suitable purloined over silver oak (country wood) joists of size 10 x 6.5 cm spaced at about 90 cm centre to centre & supported by casuarinas props 10 cm to 13 cm dia..meter spaced at about 75 cm centre to centre etc. complete complying with standard specifications. Centering for RCC works below GL (wall). |
| 11 | Supplying, fabricating & placing in position MS or deformed steel bars for all RCC items of work including cost of steel transporting, straightening, cutting, bending, cranking, binding etc. including cost of binding wire charids, laps to fix the reinforcement in all positions, all labour & materials complete complying with standard specifications & drawings as directed by the Departmental Engineer. |
| 12 | Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming & consolidation directed by the Engineer-in-Charge. |
| 13 | Colour washing the plastered walls and ceiling with approved colour over the white washed area with neat finishing of 2 coats etc, complying with standard specification and as directed by the Departmental Engineer etc, complete (Inside & outside) - same as white washing |
| 14 | Forming Embankments including raising (or lowering) earth, spreading in layers n exc. 30 cm thick, watering ramming/rolling and finishing to required size, shape, etc. N exc. 1.5m high from base. Existing surplus excavated soil from work area to be used including all costs for tools, plant, labour, etc. complete |
| 15 | Operation and Maintenance Please Enable Macros to View BoQ information |