| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: COMMANDER WORKS ENGINEER BAREILLY Name of Work: SPECIAL REPAIR TO ROAD FROM A BUTT TO C BUTT AT LONG RANGE OF THE JAT REGT CENTRE UNDER GE WEST BAREILLY Contract No : CWE / BLY / GE(W) /157 OF 2025-26 Bidder Name : SCHEDULE A(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | M&L for repair to potholes any depth, n exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc cutting around edges to atleast 25mm in depth, making good by filling in screened & graded road metal, watering and well ramming(including supply of road metal) complete all as specified and directed. |
| 3 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n exc 400 sqm exc 50mm and n exc 100mm deep complete all as specified and directed. |
| 4 | M&L for preparing of surfaces by brushing with brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with air pressure through air jet using air compressor to remove all loose dirt etc incl removing mud etc and applying evenly a tack coat of bituminous primer using paving bitumen (VG-10) at the rate of 10 Kg per 10 Sqm complete all as specified and directed. |
| 5 | M&L for preparing of black top surfaces by brushing with brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with air pressure through air jet using air compressor to remove all loose dirt etc incl removing mud etc and applying evenly a tack coat of bituminous primer using paving bitumen (VG-10) at the rate of 5 Kg per 10 Sqm complete all as specified and directed. |
| 6 | M&L for bituminous premix asphaltic semidense concrete 30mm consolidated thickness with 5.5% binder content of paving bitumen (VG-30 grade) by weight of total mix, rolled and compacted, mixed in mechanical hot mixed plant and premixed material, laid with mechanical paver finished including rolling to required camber and gradientvcomplete with 8 to 10 Tonne power roller to required compaction complete all as specified and directed. Note: (i) Design mix for SDAC shall be carried out through an authorised testing lab and the cost of testing shall be included in quoted rate. (ii) Aggragates for Bituminous works shall confirm to clause No 20B 2.5 of SSR, 2009 Part-I (Specifications) with the following constraints:- Aggregate passing 13.2 mmIS Seive- 100% Aggregate Passing 5.60mm IS Seive- 40% to 50% Aggregate passing 2.8mm IS Seive- 30% to 35% Note for item No 2 & 4 Based on job formula , in case the binder content (i.e. Bitumen) is less than the content specified under these items then a minus adjustment @ 40/- per Kg of bitumen (less consumed ) shall be appllied on the quoted rate of contractor against these items , hence the qouted rate of contractor shall be reduced based on less content of bitumen required as per job mix formula. However, no price adjustment on plus side shall be made for increase of quantity of bitumen in case of required as per job mix. |
| 7 | M&L for preparing of newly BM surface and Applying evenly a priming/ tack coat with bituminous primer at 5 kg per 5 sq metre (Paving bitumen VG-10) complete all as specified and directed. |
| 8 | M&L for Premix bituminous, macadam with binder content of 4% by weight of total mix using paving bitumen VG-30 grade, laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) complete all as specified and directed. Note :(i) Aggregates for Bituminous works shall confirm to clause No 20 B 2.5 of SSR 2009 Part- I (Specifications) with the following Constraints:- Aggregate passing 26.5 mm IS Sieve -100 % Aggregate passing13.20 mm IS Sieve -60% to 80% Aggregate passing 4.75 mm IS Sieve -20% to 30% Aggregate passing 2.36 mm IS Sieve -5% to 10% |
| 9 | S&F in repair cat eye solar reflective type of metal body alloy of size 100 mm x 100mm x 20mm with PAMA striplens reflector of medel No DA 972.0 fixed with and including MS stud of suitable size as per manufacturers instructions complete all as specified and directed. |
| 10 | S&F in repair solar cat eye aluminium alloy shall (100% water proofing design according to 65) of size 125mm x 125mm x 25mm (shank 65 mm) of high efficiency Mono crystafie solar panel 2.4V /0.3 watt one NI-ed rechargeable battery (1.2V/1600MA) consisting of super bright LED with 10,000 to 18,000 mcd completed as per manufactureres instructions etc all as specified and directed. |
| 11 | M&L for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like n. exc 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instructioncomplete all as specified and directed. Total in Figures 0.0 23 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |