| 1 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. |
| 2 | Providing & Laying of C.C M-10 (1:3:6) with A-40 Nominal Mix including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 3 | Providing & Laying of C.C M-15 (1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 4 | Providing & Laying of C.C M-20 (1:1:5:3) with A-20 and coarse including all cost of labour, material,and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 5 | Providing & Laying of C.C M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 6 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 7 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 8 | Centering & Shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 9 | P / laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 10 | P / laying of pea gravel in bed and graded filter sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 11 | P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 12 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 13 | P / Fixing 75mm dia PVC drain pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 14 | P / Fixing year plate for completion of work or as Directed By Engineer in Charge. |
| 15 | P / Fixing B.M plate for completion of work or as Directed By Engineer in Charge. |
| 16 | Supply and fixing wheel guard stone (size 150x150x1500)as Directed By Engineer in Charge. |
| 17 | E/W in filling in repairing damaged bank, making approaches and diverson including all lead lift, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge. |
| 18 | S/L RBM on damage bank, Approaches and diverson including all lead lift, compaction, dressing as required for proper completion of work including all cost labour, material and T&P etc. completeor as Directed By Engineer in Charge. |
| 19 | Supply and laying of dry bricks on soling over approch road both side of VRB including cost of all material labour and T& P required for proper completion of work |
| 20 | Construction of granualr sub base providing well graded material spreading in uniform layer with mortar grader tractor mounted appropriate equipment on prepared surface mixing by mix in place method with rotavetor at omc and compacted with smooth MORD specification |
| 21 | providing laying spreading and compacted stone aggrigate of specific sizes to water bound macadam specification including spreading in uniform thickness , band packing , rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber , applying and brooming , stone screening to fill - up the inteslices of coarse aggregate , watering and compacted to the required density grading 2 as per technical specification clause 405 |
| 22 | providing laying spreading and compacted stone aggrigate of specific sizes to water bound macadam specification including spreading in uniform thickness , band packing , rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber , applying and brooming , stone screening to fill - up the inteslices of coarse aggregate , watering and compacted to the required density grading 3 as per technical specification clause 405 |
| 23 | Brick Edging 7cm wide on both side of the road M-150 bricks complete as per PWD detailed specification no. 20.15 |
| 24 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular sub base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specification clause 502. |
| 25 | Providing and applying Tack coat with VG-10 Bitumen over bituminous surface at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with hydraulic as per technical specification clause 503. |
| 26 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumin or emulsion to required line, grade and level to serve as wearing course on a previously prepared bae including mixing in a sutable plant laying and rolling with a tree wheel 80-100 KN static roller capacity , finish to required level and grades to be followed by sal coat of type c as per technical specification clause 508 |
| 27 | Providing and laying seal coat sealing the voids in a bituminus surface laid to the specified levels ,grade abd cross fall using type -c as er technical specification Clause 510 |
| 28 | cutting pf existing metalled road as per requirement and disposal of dismantled material upto any lead or as directed byeEngineer in charge for proper completion of work including cost of all labour T&P etc Please Enable Macros to View BoQ information |