| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge |
| 3 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 4 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work |
| 5 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work |
| 6 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work |
| 7 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:3) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 8 | Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 9 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work |
| 10 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work |
| 11 | Making cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work |
| 12 | Providing and filling of local sand as back filling i/c cost of all material,labour and T&P complete for proper completion of work |
| 13 | Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work |
| 14 | Providing and Fixing of year Plate for proper completion of work |
| 15 | Providing and fixing of B.M Plate for proper completion of work |
| 16 | Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work |
| 17 | E/w in cutting or filling for making approaches of VRB in ordinary soil in layers i/c cost of all labours T& P with ramming drassing upto required levels and slopes or gradient proper completion of work and required lead up to 1.00 Km distence from work site or as per directed by Engineer- in -charge. The earth from cutting to be used in making embankment or to be deposited is spoil bank within 30m distence as per directed by Engineer-in-charge. The rates will be made as per given table in case 1.00 km lead reduced in any condition.. |
| 18 | SUUPLY AND LAYING RBM FOR MAKING HARD BASE FOR TRAFFIC I/C ncluding cost of all labour T&P etc. |
| 19 | Laying brick on soiling laid dry filling joints i/c all cost of material, labour T&P etc. for proper comp. of work. Please Enable Macros to View BoQ information |