| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps 50 mm thick with 20mm nominal size stone aggregate |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 9 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 coarse sand) |
| 10 | 12mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 coarse sand) |
| 11 | white washing with lime to give an even shade on new work (three or more coats) |
| 12 | Centering and shuttering includingstrutting propping etc. and removal of form work for foundation |
| 13 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. |
| 14 | Dismantling steel work in built up sections including tees, flats, and channels including all gusset plates bolts nuts cutting rivets etc. |
| 15 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2 |
| 16 | Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete. 0.50 mm thick with zinc coating not less than 275 gram/m2 |
| 17 | Providing and fixing 15mm nominal bore C P brass bib cock |
| 18 | Construction of CIB (includes complete pedestal/ brick size 3' X 2' , plastering, painting all complete job as per directions of engineer in-charge) |
| 19 | Carriage of sand and aggregates from an avg. distance of 22 K.M by MT Please Enable Macros to View BoQ information |