| 1 | Silt clearance at an avg. lead of 50 m and lift 1.5 m |
| 2 | Demolishing of the cement concrete manually / mech. means including disposal of material within 50m lead ( in patches) |
| 3 | Extra for every additional lift (2 nos.): |
| 4 | Earthwork by mechanical mean in trench excavation with lead 1.5m for all kind of soil: |
| 5 | Carriage of silt/mulba 100 mtr. avg. by head load: |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level |
| 7 | (A) 1:1.5:3 mix with 20 mm size of agg. |
| 8 | (B)1:3:6 mix with 20mm size of aggregate |
| 9 | Dismantling old plaster or skirting raking of joints and cleaning the surface for plaster including disposal of material within 50m lead. |
| 10 | 18 mm plastering upto 10 m height above ground level with terrazzo finished, rubbed and polished complete under layer 12mm thick cement plaster 1:3 mix and top layer from thick white, black, chocolate, grey, yellow or boroda green marble chips of 3mm and down size laid in cement marble powder mix 3:1 (1 cement : 3 marble powder) by weight in proportion 4:7 (4 cement marble powder mix : 7 marble chips) by volume |
| 11 | 15 mm Cement plaster of mix 1:4 mix ( 1 cement:4 coarse sand) |
| 12 | 15 mm Cement plaster of mix 1:4 mix ( 1 cement:4 coarse sand) |
| 13 | Number of Labour engaged for cutting of trees from the pillar of aqueduct |
| 14 | Banking Excavated of thin layers etc. for all kinds of soil. |
| 15 | Dry stone pitching excluding cost of stone |
| 16 | Grouting of stone pitching M-10 nominal mix concrete |
| 17 | Supply of stones |
| 18 | Carraige of stone avg. distance of 10km by MT |
| 19 | Centering and shuttering |
| 20 | Carraiage of chips from local market to site of work at L.M.R and keeping provision for water proofing |
| 21 | Carriage of sand and Bajree avg. distance of 10km by M.T |
| 22 | Providing and filled inn position blown bitumen in expansion joints |
| 23 | Uprooting of rank, vegetation from aqueduct body inside as well as outside including cleaning of pier cups, cleaning of learing plates/bearings with oil and greasing of bearing plates and bearings. Cleaning of expansion joint by removing all kind of dust complete including all types of material cost. |
| 24 | Add 10% above except item No.18 Please Enable Macros to View BoQ information |