|
| 1 | Namke of Work :- Repairs to vehicles under AOR GE Kapurthala (Ser No 02 to 04) |
| 2 | Repairs to TATA XENON Veh BA No 21C-109420 K. |
| 3 | Servicing of the vehicles, Checking the serviceability of the vehicle oiling, Engine tuning, overhauling fixture accessories replacement of first moving parts changing oil , maint of battery with electrolyte solution, distilled water, wheel alingnment, Greasing to wheel bearing / Hub Greasing of all mechanical moving parts,Checking of the Battery Charging system. Each Job -01 |
| 4 | Lubrication Pipe. Pc-01 |
| 5 | Cylinder head gasket. Pc-01 |
| 6 | Engine seal kit. Kit -01 |
| 7 | Coolant. Ltr -05 |
| 8 | Fuel Filter. Pc-01 |
| 9 | Air Filter. Pc-01 |
| 10 | Oil Filter. Pc-01 |
| 11 | Brake Oil. Ltr -01 |
| 12 | Front wheel bearing inner & outer. Set - 02 |
| 13 | Brake liner. Each - 04 |
| 14 | Front Shocker. No - 02 |
| 15 | Wheel Cylinder Front. Ltr - 01 |
| 16 | Wheel Cover/Cap. Set of 04 - 01 |
| 17 | Fog Light. No - 02 |
| 18 | wheel Cylinder Rear. Job - 01 |
| 19 | Front Shocker Bracket. No-01 |
| 20 | Gear Box Main Shaft. Job - 01 |
| 21 | Rear Brake Drum. No -- 01 |
| 22 | Clutch Plate. Job - 01 |
| 23 | Clutch Bearing. Job-01 |
| 24 | Brake leather shoe. Nos -04 |
| 25 | Brake cylinder Kit. Nos -02 |
| 26 | Horn assembly with relay. Set- 01 |
| 27 | Head light assembly. Nos - 02 |
| 28 | Parking light side indicator. No -02 |
| 29 | Side looking mirror. No - 02 |
| 30 | Self starter repair, Job -01 |
| 31 | Penion seal, bell joint , centre pin and suspension rod. Each - 01 |
| 32 | Labour charges for Suspension work. Job - 01 |
| 33 | Wheel alignment & Balance. Job - 01 |
| 34 | Repairs to Motor Cycle Hero Honda Veh BA No 12A-065212K |
| 35 | Dismantling of Engine , gear box and clutch assembly for taking up required repairs and reassembling the same after replacement of unserviceable spare parts: 01 Job |
| 36 | Replacement of spare parts : |
| 37 | (a) Replacement of Sparking plug-01 and gasket -01 set |
| 38 | (b) Replacement of clutch plate-01 |
| 39 | (c) Replacement of Rear Shocker spring |
| 40 | (d) Replacement of Engine Oill - 01 ltr |
| 41 | Dismantling/opening to Chain set and chain cover and replacement of US chain set with cover and cluch lever - 02 Nos Complete one Job |
| 42 | Dismantling /opening of head light/parking and indicator light system taking up required repairs and reassembling the same after replacement of defective spare parts as indicater lamps complete one Job |
| 43 | (a) Replacement of Head light complete with lamp-01 Nos |
| 44 | (b) Replacement of indicator rear set complete-01 No |
| 45 | Repair to break system and after replacement of defective spare parts as breakshoe and break liner complete -01 Job |
| 46 | (a) Replacement of Accelerator cable-01 Nos |
| 47 | Dismantling /Replacement of Leg Guard ,Kick start kit ,side stand and Steering ball race of defective parts:-01 Job |
| 48 | (a) Replacement of Front wheel cover each |
| 49 | (b) Replacement of Leg Guard each |
| 50 | (c) Replacement of steering ball race play each |
| 51 | (d) Replacement of Battery 06 volt each |
| 52 | Cleaning washing & polishing incl greasing of all parts |
| 53 | Repairs to Motor Cycle HF Delux Veh BA No : 20A-074879Y |
| 54 | Dismantling of Engine , gear box and clutch assembly for taking up required repairs and reassembling the same after replacement of unserviceable spare parts: 01 Job |
| 55 | Replacement of spare parts : |
| 56 | (a) Replacement of clutch plate-01 |
| 57 | (b) Replacement of Sparking plug-01 and gasket -01 set |
| 58 | (c) Replacenent of CB point-01 Nos |
| 59 | (d) Replacement of Engine Oill-01 ltr |
| 60 | (e) Replacement of Rear Shocker spring |
| 61 | Dismantling/opening to Chain set and chain cover and replacement of US chain set with cover and cluch lever - 02 Nos Complete one Job |
| 62 | Dismantling /opening of head light/parking and indicator light system taking up required repairs and reassembling the same after replacement of defective spare parts as indicater lamps complete one Job |
| 63 | (a) Replacement of Head light complete with lamp -01 Nos |
| 64 | (b) Replacement of indicator rear set complete -01 No |
| 65 | Repair to break system and after replacement of defective spare parts as breakshoe and break liner complete -01 Job |
| 66 | Dismantling /Replacement of Leg Guard ,Kick start kit ,side stand and Steering ball race of defective parts:-01 Job |
| 67 | (a) Repacment of kick start kit each |
| 68 | (b) Repacment of side stand each |
| 69 | (c) Repacment of steering ball race play each |
| 70 | (d) Repacment of Front wheel cover each |
| 71 | (e) Repacment of Battery 06 volt each |
| 72 | (f) Repacment of Seat cover each |
| 73 | Cleaning washing & polishing incl greasing of all parts |
| 74 | Certified : - |
| 75 | 1. Fund are available to meet the cost of expenditure |
| 76 | 2. Ch to 86/495/04 |
| 77 | 3. Retrived material will be property of the contractor |
| 78 | Note : (a) Engine Oil 7 Ltr for Tata Xenon will be issued by Department. Please Enable Macros to View BoQ information |