| 1 | maintenance of Building |
| 2 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 3 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above |
| 4 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 5 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work |
| 6 | 50.9.13.1:Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete . |
| 7 | 50.9.14.1:Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. |
| 8 | OD261110/2025-2026:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on wood frame work complete (wood frame work to be paid separately) |
| 9 | OD261111/2025-2026:Fixing on roof pressed clay tile (Departmental Mangalore tile) of 20 mm nominal thickness andof approved size and as per approved pattern on wood frame work complete (wood frame workto be paid separately) MOD 12.48 |
| 10 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). |
| 11 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. |
| 12 | 13.109.1:Finishing walls with water proofing cement paint of required shade :Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. |
| 13 | 14.83:Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. |
| 14 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. |
| 15 | 14.75:Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. Please Enable Macros to View BoQ information |