| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil |
| 2 | P/L of hand packed Stone Soling including ramming and carriage of avg 5km lead and complete job. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. |
| 6 | Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete.welded |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a primingcoat of approved steel primer all complete |
| 8 | Brick with FPS bricks of class designation 75 in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) incl all carriage of materials from source to site of work upto v level. |
| 9 | Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture |
| 10 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: Lean mix 1:4:8 |
| 11 | Carriage of different items by machanical transport including loading/unloading. |
| 12 | 40mm + 20mm nominal size aggregates for an average lead of 20 Kms |
| 13 | Sand for an average lead of 20 Kms |
| 14 | bricks for an avg. lead of 15 km Please Enable Macros to View BoQ information |