|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50mand lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size). |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete |
| 6 | Centring and shuttering including strutting, propping etc and removal of form work for.- |
| 7 | Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Suspended floors, roofs, landings, balconies and access platforms. |
| 9 | Edges of slabs and breaks in floors and walls below 20 cm wide |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 11 | Providing and Laying River Bed Material by way of spreading in uniform layer, watering, and compacting with power road roller 8-10 capacity including carriage of material with average lead of 15km. The measurement to be taken of compacted/finished work. |
| 12 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 13 | Engaging JCB for site clearance/removing malba from road surface/ berm cutting, etc. |
| 14 | Carriage of material including loading/unloading and stacking at site for an avg. lead 15 Km by mechanical transport |
| 15 | Carriage of sand/Stone Aggregate below 40mm for an avg. lead 15 KM MT Please Enable Macros to View BoQ information |