| 1 | a. Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) b.Filling available excavated earth (excluding rock) in renches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. c. Carraige of excavated earth by MT upto 5Km incl. all charges etc as directed by EIC |
| 2 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.) In rows 5 cm apart in either direction |
| 3 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) |
| 4 | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels Granite of any colour or shade (Area of slab over 0.5 sqm) 16mm/18mm |
| 5 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 6 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/ 10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 7 | Providing and fixing 15cm wide 45 cm overall semi circular plain G.S. sheet gutter with iron brackets 40x3mm size, bolts, nuts and washers etc. including making necessary connections with rain water pipes complete. 0.80 mm thick with zinc coating not less than 275 gram/m2 |
| 8 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (Snow Stoppers). |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 10 | Providing and laying of stone soling in trenches hand packed all inclusive leads, lifts, loading, unloading, head load, ramming/ dressing and carriage of materials from approved nearest sources to site of work complete. |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge,welded incl chain link on existing wall,Made of G.I. wire of dia 4 mm |
| 13 | Painting with aluminum paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 14 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded (Angle Iron). |
| 15 | Carriage of materials by MT incl. loading,unloading,etc complete job. |
| 16 | Stone Aggregate for an avg. lead of 10 km |
| 17 | Sand for an avg. lead of 30 km Please Enable Macros to View BoQ information |