| 1 | Supply , Transportation and errection of 11 MTR long ST Poles (410 SP56) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) |
| 2 | Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) |
| 3 | Supply , Transportation and errection of 8 MTR long ST Poles (410, SP-15) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) |
| 4 | Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR DOG Conductor, (100mm2 ACSR Conductor) as per REC standard. |
| 5 | Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR RABBIT Conductor, (50mm2 ACSR Conductor) as per REC standard. |
| 6 | Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers) |
| 7 | Supply and fixing of 300 mm Sq Single Core 1.1 KV Grade , PVC Insulated stranded conductor FRLS Type |
| 8 | Supply and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 9 | Earthing of Poles Complete by Spike earthing Rod 20mm 2.5mtr long with GI strip 25x3mm (as per REC Standards) |
| 10 | Supply and fixing of Gapless surge arrestor, 9 KV, 10KA , LA station Type including nuts and bolts, washers, clamps etc. complete job as per REC standard. |
| 11 | Supply and fixing of 11KV G.O set (AB Switch 3-phase,3 -pole,200A) including nuts and bolts, washers, clamps etc. complete job as per REC standard. |
| 12 | Supply and fixing of LT Fuse Set. complete job as per REC standard. |
| 13 | Supply and fixing of 11KV Horn Gap fuse set 3 phase,200A including nuts and bolts, washers, clamps etc. complete job as per REC standard. |
| 14 | Supply and fixing of 11 kV Isolator, Double Break,3-pole, 630Amp, horizontal mountingType, with Earth Switch |
| 15 | Supply and fixing of 11 Kv Link set 600 Amperes |
| 16 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.66 cum/pole Pit & Tappered at the Top. (as per REC standard) for 11 MTR ST Pole |
| 17 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole |
| 18 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole Pit & Tappered at the Top. (as per REC standard) for 8 MTR ST Pole |
| 19 | Poviding and Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc. |
| 20 | Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 21 | Supply, Carriage up to site, Installation, testing and Commissioning of danger Plates |
| 22 | Supply, Carriage up to site, Installation, testing and Commissioning of anti-climbing devices with clamps |
| 23 | Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) as per REC standard |
| 24 | Supply, Carriage up to site, Installation of G.I nuts and bolts etc. |
| 25 | Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc. |
| 26 | Pre, during and post execution geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station) Please Enable Macros to View BoQ information |