| 1 | Removing of Existing 83mm Paver block including cost of all labour charges for disposal from site |
| 2 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil as Directed by the Departmental officers |
| 3 | 63mm PVC pipe |
| 4 | Supplyof Materials |
| 5 | 63mm Pvc pipe |
| 6 | Waste Not Tap |
| 7 | 63mm Pvc coupling |
| 8 | 63mm Pvc Elbow |
| 9 | 63mm Pvc tee |
| 10 | 63mm Pvc bend |
| 11 | 63mm Pvc End cap |
| 12 | 63mm HDPE pipe |
| 13 | Lowering of 63mmPVC Pipes and Specials in the trenches and laying to proper grade and alignment, Joining with GI Specials and as directed by the TWAD Officers. |
| 14 | Refilling the Excavated trenches after laying of 63mm PVC Pipe Complete as per standard Specification |
| 15 | Supply and delivery and fixing of 1000 Liter HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., |
| 16 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils as directed by Departmental officers b Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil complete etc.., |
| 17 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 18 | Plain cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mmH.B.G.metal for foundation and flooring including dewatering if 'necessary and laid inlayer of not more than 15 cm thick complying with standard specification. |
| 19 | Brick work in cement mortar 1:5 (One cement and Five sand) using country bricks of size 8 ¾\\" x 4¼\\"x2¼ \\" including cost and conveyance of allmaterials to site and all other labour charges and incidential charges etc., complete complying with standards specifications. |
| 20 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 21 | Supplying and filling the basement with Good Earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification. |
| 22 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 23 | Supply and fixing of 15 A arial fuse unit on suitable MS plate with hylem sheet on thetapping pole with necessary clamps. only. |
| 24 | PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE CONFORMING TO IS 694/1990 AND AS AMENDED THEREAFTER 4sqmm |
| 25 | Supply and fixing of 1.50 HP Compressor Motor and Pump Please Enable Macros to View BoQ information |