| 1 | M&R to Water Supply Scheme for NIA...Shifting & commissioning of 320 KVA DG set at IPCL Raw Water, Nagothane |
| 2 | Dismantling 320 KVA DG Set with canopy from base frame and remove the DG set from foundation etc complete. |
| 3 | Crane Charges Loading & Unloading for 320 KVA DG Set. |
| 4 | Assembling Canopy of 320 KVA DG Set |
| 5 | Installation of 320 KVA DG set and all necessary Cables Connection of DG set, Testing ,commissioning and Load Trial of 320 KVA DG set. with test trial complete. |
| 6 | Supplying & erecting of Residential silencer with fitting charges. |
| 7 | Supplying & erecting of Radiator assembly with fitting charges. |
| 8 | LT Cables (Aluminum) (CB-LT/AL) |
| 9 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 3½ core 240 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL |
| 10 | Cable Enclosures (CB-CE) |
| 11 | Supplying and laying (including excavation of suitable width & depth up to 90 cm) 120 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, complete. |
| 12 | Plate, Pipe type Earthing (EA-EP) |
| 13 | Supplying, installing and testing earthing with copper earth plate size 60 x 60 x 0.315 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover with minimum 25 kg Carbon based environment friendly back fill ground ehancing compound complete with all accesories of copper materials & recording the results as per specification no EA-EP/EF |
| 14 | Accessories |
| 15 | Supplying and erecting copper strip of required sizes used for earthing on wall and/or any other purpose with necessary aluminium clamps fixed on wall painted with bituminous paint with joints required as per specification no EA-EP. |
| 16 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 17 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. |
| 18 | Providing and laying in situ /Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering formwork, laying/pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 19 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Please Enable Macros to View BoQ information |