| 1 | Earthwork in filling by transported good quality earth with average lead upto 5KM including all cost of material, labor, T&P etc and all taxes for proper completion of work excluding GST |
| 2 | Supply of Dry Split Stone (20-40 kg wt.) at Work Site including Loading, unloading,Stacking, Stacking of Stone,Cost of Labour T&P, Royalty and All other Taxes but Excluding GST, etc.complete. |
| 3 | Supplying GI wire crate 8 SWG GI wire of size 3.00x1.50x2.00 M and 15cmx15cm mesh double knotted i/c all cost of material, labour and T&P complete. |
| 4 | Laying and placing split stone (Lunching Apron) in GI wire crate 8 SWG GI wire of size 3.00x1.50x2.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material, labour and T&P complete. |
| 5 | Laying Split Stone (20-40 kg wt.) in Pitching i/c Cost of Labour T&P, Royalty and All other Taxes but Excluding Cost of Split Stone etc.complete. |
| 6 | Supply of HDPE Woven E C Bags Confirming To BIS No-11652-2014 of New Cement Bag size at site including Cost of Material, Carriage, Loding, Unloading,Stacking,T&P and Taxes etc. required for completion of Work. |
| 7 | Supply of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69 M at site including Cost of Material, Carriage, Loding, Unloading, Stacking, T&P and Taxes etc. required for completion of Work. |
| 8 | Filling of HDPE Woven E C Bags For Launcing Apron Confirming To BIS No-11652-2014 of New Cement Bag size With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work. |
| 9 | Filling of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69M With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work. |
| 10 | Spreading Excavated Earth in 30.00 Cm Thick Layers Over G.E.O Bags with all Cost of Labour T&P Etc Completion of Work. |
| 11 | Supply & Fixing of Porcupine Constructed with 1:2:4 R.C.C Having 6 Nos Member of size 3.00X0.10X0.10M Joined with Specified Bolt & Washers ll including All Cost of Material, Carriage, Loding, Unloading, Stacking, T&P and Taxes etc. required for completion of Work. |
| 12 | Supplying & Fixing of Bamboo Bracing 85-100 mm dia i/c all /Cost of Material, labour, T&P and Taxes Etc. Required for Completion of Work. |
| 13 | Supplying and Filling Jhankar or Jhau and Placing in Position Involing Carriage up to 5.00 km I/c all Cost of Material, Labour, T&P and Taxes etc. Required for Completion of Work. Please Enable Macros to View BoQ information |