|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305 and 1603.4 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimetree) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, sale tax GST or any other taxes imposed by the Government. |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain / reinforced cement concrete in open foundation for all type of structure such as Retaining walls, Breast walls etc of plain cement concrete nominal mix 1:5:10 ( One cement isto five sand isto ten graded crushed stone aggregate 40 mm ( forty millimatre) nominal size in or under water and curing complete for 14 ( fourteen) days including pumping or bailing out water, ( surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying water complete for all heights and depths including cost of form work as per drawing and MORD techanical specification clause 802,803,1202 and 1203 or as per direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates are inclusive of the octori, royality, Malkana, toll tax, sale tax GST or other taxes imposed by the Government. |
| 3 | Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 and as per the direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates are inclusive of the octori, royality, Malkana, toll tax, sale tax GST or other taxes imposed by the Government. |
| 4 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete in sub-structure GradeM-15 (M-fifteen) nominal mix 1:2 1/2:5 (one cement: two and half sand: five graded crushed stone aggregate (40mm) forty millimetre nominal size) on gour or under water, incluing pumping of bailing out water/dewatering (sruface and sub-soil water) and removal of the slush which amy arise at the time of laying cocrete for all the height/depths and any quantum of water, in toe walls, parapets etctera including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 and 1200 and as pe the direction and the entire satisfaction of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, malkana toll tax , and other taxes imposed by the Government.but execuding GST. |
| 5 | Back filling with granular material behind abutments, return walls, wing walls and retaining walls complete as per drawings and MORD technical specification clause 1204.3.8 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including octroi, royalty ,Malkana, toll tax, sales tax GST or any other taxes imposed by the Government. Please Enable Macros to View BoQ information |