| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from road side masonary open drain/ nikashi etc. by mathor labour after removing concrete slab/manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools & plants including expulsion of impure/inflammable/asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of Municipal Corporation/Municipality/Notified Area Authority/Industrial Township Authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side in all respects, complete as per direction of the EIC. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) |
| 3 | Cleaning of floating materials/garbage/any other foul materials from incoming sewer of drainage pumping station/adjoining penstock gate/open Nikashi/Lock Gate at Canal etc. by mathor labour after removing concrete slab/manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools & plants including expulsion of impure/inflammable/asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of Municipal Corporation/Municipality/Notified Area Authority/Industrial Township Authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangemen of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side in all respects, complete as per direction of the Engineer-in-Charge. (Land for disposal to be arranged by the contractor). |
| 4 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 5 | Supply of silver sand stacked at site |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, Incidental charges etc. all complete (capacity 50 kg) |
| 7 | Labour charges for filling empty cement gunny bag/polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates (stone/brick) and sewing as done in case of cement bags (tying with a knot after fliing will not be accepted), and stacking with a lead of 30 metre as per direction of Engineer-in-charge (cost is excluding the cost of any types of filling materials) NB:- Volume of earth/sand filled bags should not be less than 0.028 cum/ bag. |
| 8 | Dumping in position earth/sand filled gunny/poly bags (capacity 50 Kg) within a lead of 30 metre inclusive of all lifts. |
| 9 | Dewatseeing by pumps including all leads, litts and making all arrangements of disposal, where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage, breakage and making wet connections, [Note ln case of any other situation demanding such, emergency dewatering use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This them shall be executed on the specific direction duty supported by proper clarification of the E.I.C who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor). |
| 10 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-In-Charge for measurement of Bag & then disposing off the same at a distance not less than 150 metre from the channel site. |
| 11 | GST @ 18% on Sl No 1 TO 10 |
| 12 | Cess @ 1 % On Sl No 1 to 11 Please Enable Macros to View BoQ information |