| 1 | Cleaning Jungle including uprooting of rank vegetation grass, bush, wood trees and saplings of girth upto 30 cm measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. Extra rates for quantities of works, executed: 2.4.1In or under water and/or liquid mud, including pumping out water as required( increase 20%) DSR CH. NO. 2 CODE NO. 2.6.1&2.24.1 |
| 3 | Excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre and lead upto 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space bwtween the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge of 30 m from the foundation trenches. AS PER SOR NO.251 |
| 4 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc.. Including welding, grinding, buffing. Polishing and making curature ( wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc. of required size, on the top of the floor or the side of waist slab with suitable arrangment as per approved of Engineering-in-charge (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 5 | S/F Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). |
| 6 | Providing and laying spreading and Compacting to stone Bllast 22.50-53mm Size To WBMspacifcation including spreding in uniform thickness hand Packiung and Manual Compaction by Ramer to proper Blinding with local sand to fill up theinterstces of Ramming and compactkng to the required density. |
| 7 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer S I no DAR16.83 |
| 8 | Providing and laying of interlocking concrete block pavement having thickness 80mm as per drawing and technical specification clouuse1504 (exclusive G.S.B) S.I N.O MORD 1500(6.7)2 |
| 9 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost).S.i No(16.84) |
| 10 | Providing and laying base concrete 1:4:8 Cement C/sand and 40mm gauge stone ballast including supply of all material labour T&P etc all complete S.I. 281 |
| 11 | Ist class brick work in found 1:4 cement and c/sand mortar including supply of All material labour T&P etc all complete n.s.305 |
| 12 | 2 cm thick cement plaster in dado of skirting in 1;2 consisting of one part of cement & two parts of approved coarse sand laid in panels finished with 3 mm floating coaty of neat cement or cement mixed with marble dust in ratio 5:1 including supply al all mateials, labour, T&P etc. required for proper completion of the work. S.I No 597 |
| 13 | R.C.C. work with cement approved coarse sand approved stone ballast in the proportion of 1:1.5:3 in lintels of doors & window excluding supply of reinforcement and its binding but includingits fixing and binding the same with 24 B,W.G.G.I. binding wire and including necessary crentering & shuttering etc. and also including supply of all material labour and T&P etc. required for proper completion of the work. binding wire cost being included in the item. |
| 14 | Mild steel or iron work such as RB or R.C.C. work including etc all complete .S.I. 504 |
| 15 | Cement concrete with 2 cm gauge approved stone ballast approved coarse sand cement in the proportion of 4:2:1 including supply of all material T&P etc. required for proper completion of work.279 |
| 16 | Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 |
| 17 | Precast Bench at MR Please Enable Macros to View BoQ information |