| 1 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 2 | 11 KV CTPT Pole mounting unit |
| 3 | 11 KV Electronic TVM Meter |
| 4 | 11 KV PPMC |
| 5 | 11/0.4 KV 250 KVA Transformer |
| 6 | 11/0.4 KV 400 KVA Transformer |
| 7 | 11 KV XLPE Cable 3X185 sq mm |
| 8 | 11 KV XLPE Cable 3X120 sq mm |
| 9 | 11 KV XLPE Cable 3X70 sq mm |
| 10 | I/D & O/D C/J Kits suitable for 3X70 sq mm XLPE Cable |
| 11 | Straight Through suitable for 3X70 sq mm XLPE cable |
| 12 | I/D & O/D C/J Kits suitable for 3X120 sq mm XLPE Cable |
| 13 | Straight Through suitable for 3X120 sq mm XLPE cable |
| 14 | I/D & O/D C/J Kits suitable for 3X185 sq mm XLPE Cable |
| 15 | Straight Through suitable for 3X185 sq mm XLPE cable |
| 16 | 11/0.4 KV 25 KVA Transformer |
| 17 | 11/0.4 KV 63 KVA Transformer |
| 18 | 11/0.4 KV 100 KVA Transformer |
| 19 | S.T Pole 11 mtr. long |
| 20 | S.T Pole 9 mtr. long |
| 21 | PCC 8.5 mtr long |
| 22 | ACSR Dog conductor |
| 23 | ACSR Weasel conductor |
| 24 | LT AB Cable (3X95+1X70+1X16) Sq.mm. |
| 25 | LT AB Cable (3X120+1X95+1X16) Sq.mm. |
| 26 | 11 KV Pin insulator with Pin |
| 27 | 11 KV Disc insultor with fitting |
| 28 | 11 KV Dropper angle (100X50X2028 mm) |
| 29 | 11 KV S/S Base angle |
| 30 | 11 KV Top Channel |
| 31 | 11 KV V Type Cross arm |
| 32 | 11 KV D.O. Fuse set |
| 33 | 11 KV TPMO with Polymer insulator |
| 34 | LT XLPE Al. 3.5X70 sq mm |
| 35 | LT XLPE Al. 3.5X150 sq mm |
| 36 | LT XLPE Al. 1X240 sq mm |
| 37 | LT Cable 1X400 sq mm |
| 38 | Stay set complete with 5 Kg wire |
| 39 | Earthing Complete |
| 40 | T-Off channel (125X65X1300) mm |
| 41 | Supply of following material/fitting complete in all respect :- |
| 42 | LT Distribution Box with Clamp |
| 43 | LT Shackle insulator |
| 44 | Stone Pad 300x300x75 mm |
| 45 | Danger Board with clamp |
| 46 | Number Plate |
| 47 | LT Clamps |
| 48 | Insulated Dead end clamp with I hook |
| 49 | Barbed Wire |
| 50 | Suspension clamp with I hook (Insulated) |
| 51 | LT insulated Piercing connector |
| 52 | LT PVC cable 1X35 Sq.mm. for energizing D.B. |
| 53 | F Bracket |
| 54 | Holding clamp with Nuts & Bolts |
| 55 | Al Lugs 70/150/240/400 sq mm long barrel |
| 56 | GI Nuts & Bolts of different sizes |
| 57 | Copper L Piece |
| 58 | HDPE Pipe dia 6' inch |
| 59 | G.I Pipe dia 6' inch |
| 60 | G.I Pipe dia 4' inch |
| 61 | The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification. |
| 62 | The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of STP Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification. |
| 63 | Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor |
| 64 | Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 65 | Fabrication, errection, commissioning & Testing of 25/63/100/250/400 KVA T/F on Double Pole/Plinth with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor. |
| 66 | Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) |
| 67 | Erection of Fuse Set |
| 68 | Erection of TPMO |
| 69 | Laying, stringing, sagging, binding and jumpering of ACSR Dog/Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required. |
| 70 | Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor) (Complete in One Job) |
| 71 | Providing & installation of Neutral & Body pipe earthing for distribution transformer above 100 kVA using (1.2 to 1.5) inch dia GI pipe electrode with 40ft deep boaring/or upto water lever, including excavation, boring, charcoal& salt filling, watering arrangement, GI strip connection, testing of earth resistance as per IS:3043 in all respect. |
| 72 | Laying, stringing, sagging, binding and jumpering of ABC Cable (Size may vary) of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. |
| 73 | Hoisting & Looping of 11 KV XLPE Cable Providing GI Pipe 3 M Long with complete Work |
| 74 | Erection of 11 KV XLPE Cable Jointing Kit/Straight Through with complete work |
| 75 | Installation of PPMC & 11 KV CT/PT Pole Mounting Unit |
| 76 | Earthing of PPMC & CT/PT unit |
| 77 | Laying of HDPE Pipe 6 inch Diameter for laying of 11 KV XLPE Cable by horizontal drilling method. The HDPE pipe shall be of PE 80 grade with pressure rating PN6 conforming to IS 4984/1995 and shall have wall thickness of 6.20 to 7.10 mm (HDPE pipe 6 inch dia with elbow and socket for 11 KV cable will be supplied by contractor) |
| 78 | Laying and dressing of under ground 11 KV XLPE Cable (Size may vary) by Horizontal drilling method as per RESPO norms. The Depth of horizontal drilling shall be between 2 to 3 meters or as per site required. |
| 79 | Laying and dressing of under ground 11 KV XLPE by Digging method using sand & Bricks as per RESSPO norms. |
| 80 | Laying and sagging of overhead 11 KV XLPE Cable as per site required. |
| 81 | Dressing, Tagging and Safe Laying of 11 KV XLPE cable under Concrete roadside trench with necessary material. (All Necessary Materials provided by Contractor) |
| 82 | Construction of T/F plinth of size 2x2x1.2 mtr with the help of first class brick & 9\\" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4\\" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 Nos. ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. |
| 83 | Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. |
| 84 | Shifting of existing Transformer from its existing place to new site with complete work |
| 85 | Supply and Complete Installation of 2 Nos. Henley Type Tailless Unit 300 AMP in Box using LT XLPE 1X240 Sq.mm. Cable, LT Crimping Lug, GI Nuts & Bolts etc (as per site requirement) on 11/0.4 KV Distribution Transformer. (Only LT XLPE 1X240 Sq.mm. Cable will be provided by Department)Specification of Henley Type Tailless Unit 300 AMP described as below-1. Henley Type MS Sheet duly painted grey enameled paint- MS of 18 SWG (54X4.5 inches) with holes as per requirement2. 6 No. Insulator- Made of White Glazed Porcelain3. 6 No. Copper Spring Contact- 32X3.7 mm Made of Copper4. 3 No. \\"L\\" Contact - Brass5. 3 No. Metal Part Connector For Holding Busbar- Brass6. 1 No. Casted Patti- M.S.7. 1 No. Neutral- Brass8. Iron Clip, Bolt, Nuts, Washer and Screw etc for Tightening- All Galvanized9. Copper Bus Bar Strip- 500X50X5 mm (3 Nos.Copper Busbar Strip to be used on 2 Nos. Tailless unit)10. Aluminium Bus Bar Strip- 500X50X5 mm (1 No)All work will be done as per RESSPO Norms & relevent IS Specification. |
| 86 | Supply, fabrication, erection of LT Pillar Box for Tailless Unit after making Plinth of Height 300 mm above ground level LT Pillar Box Size- 1650X1050X520 mm with Gate and Proper Locking arrangement (Canopy of 15 Degree), should be made of Galvanised steel sheet. Including Earthing of Pillar Box.All work will be done as per RESSPO Norms & relevent IS Specification. |
| 87 | Supply and complete installation of SMC Box of size 450x375x200 mm for 25 kVA to 100 kVA Transformer on Pole (Box made out of (Thermostate Plastic) Sheet Moulding Compound by the process of Hot Press Compression moulding confirming to IS: 13410, SMC base or Doors shall not soften or bend on Heating, Doors fitted to Base by concealed hinges, Thickness- 2mm, Tolerence : +/- 5%) including provision of LT Fuse Protection set suitable for Transformer (All material including Aluminium Lugs, Clamp, Nuts & Bolts etc shall be supplied by the contractor.) |
| 88 | Dismantling of following Line materials and safe loading, unloading and carraige of dismantled material from work site to departmental store |
| 89 | STP pole 11/9 meter long |
| 90 | Conductor Please Enable Macros to View BoQ information |