|
| 1 | BOQ FOR REPLACEMENT & STRAIGHTENING OF DAMAGE TILTED POLES, RESAGGING OF LOSSE SPAN UNDER EDSD, BHATTIPUR UNDER ELECTRICITY DISTRIBUTION DIVISION, LAKSAR, HARIDWAR IN O&M HEAD AGAINST E-TENDER NO- 164/EDC(H)/2025-26 Bidder's Name & Address S.N. Work Unit Qty. Rate Amount (In Rs.) A Decentrlized Material |
| 2 | X ARM Clamp for PCC Pole with N/B |
| 3 | LT Clamp for PCC Pole with N&B |
| 4 | Dead end Clamp with J Hook |
| 5 | Suspension Clamp with J Hook |
| 6 | Stay Clamp for PCC Pole |
| 7 | Shackle insulator |
| 8 | Stay Insulator 100x115 |
| 9 | LT XLPE Cable 1x35 sqmm |
| 10 | LT Distribution Box 3 Phase |
| 11 | LT Bare Neutral PG Clamp Total (A) 0.0 B LABOUR |
| 12 | Erection of Earthing Rod |
| 13 | Febrication of Steel |
| 14 | Excavation of Pit for Stay Set |
| 15 | Erection of LT Stay Set |
| 16 | Erection of 11 KV Stay Set |
| 17 | Grouting of Stay Set |
| 18 | Excavation of Pit for Pole |
| 19 | Erection of Single PCC Pole |
| 20 | Dismantling of PCC Single Pole |
| 21 | Dismantling of 11 KV Line (Weasel) |
| 22 | Erection of Bracket in LT Line |
| 23 | Laying of Rabbit Conductor in HT Line |
| 24 | T-off Connection complete 11 KV Line |
| 25 | Making of Section Pole |
| 26 | Cartage PCC Pole, 21-50 KM |
| 27 | Cartage of Petty Material, 21-50 KM |
| 28 | Headload cartage PCC Pole(0-1 KM) |
| 29 | Headload cartage of Material(0-1 KM) |
| 30 | Disconnection & Reconnection of Consumer |
| 31 | Dismantling of AB Cable |
| 32 | Laying of LT XLPE ABC 3x120+1x95+1x16 Sq.mm |
| 33 | Disman of LT XLPE ABC 3x120+1x95+ 1x16 Sq.mm |
| 34 | Replacement of Base Channel of DTRs |
| 35 | Straightening of Tilted STP Poles |
| 36 | Tightening of Stay Set |
| 37 | Resagging of 11 KV Line |
| 38 | Resagging of LT AB Cable |
| 39 | Sagging/Resagging of ACSR/ABC LT Line |
| 40 | Installation of LT Distribution Box |
| 41 | Fixing of Dead End Clamp |
| 42 | Fixing of Suspension Clamp with I Hook |
| 43 | Dismantle of Exiting TPMO/GO/ISOLATOR |
| 44 | Reconnection of Jumpers Cable & Earthing |
| 45 | Fixing of 11 KV Pin Insulator |
| 46 | Renozzeling of existing stay set |
| 47 | Dismentaling of HT/LT Jumper |
| 48 | Erection of Stay Clamp |
| 49 | Looping and Chopping tree branches Total (B) 0.0 Total (A+B) 0.0 Note :- GST will be paid extra as actuals. Company/Firm Name Name Designation Date |