| 1 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 2 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 3 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 4 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 5 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 7 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 8 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 9 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 10 | Doing horizontal directional drilling along/across roads, supplying and pulling 125mm dia HDPE pipe and drawing 11KV 3 X 300 sq.mm, Aluminium XLPE UG Cable through the HDPE pipe, including surveying the site for collecting information about underground utility installations and other obstructions using suitable modern sensing equipment, restoring the damages occured if any, pit marking, pilot drilling, pre ramming, closing of pits with normal soil/filled sand/crusher sand and consolidation to the satisfaction of the road owner and traffic police as they insist, taking cable to the open trenches, RMUs, transformer yards etc mounting the cable after providing loop at 1.2m depth, pulling HDPE (PE 80, PN6 kgf/cm2) at rising point(0.5m below ground level and 1.5m above ground level), testing, commissioning, placing route markers at 100m interval, writing identification name, date of laying, date of commissioning etc legibly at the cable raising point using polyurethane paint etc as per the direction of department officers including cost & transportation of HDPE pipe and coupler and excluding conveyance of cable. |
| 11 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). Please Enable Macros to View BoQ information |